Notice of Public Information Centre – Master Plan

2025 Water and Wastewater Master Plan for the Lake-Based System

How is this Study being Undertaken?

Background

Peel Region is completing the 2025 Water and Wastewater Master Plan for Lake-Based Systems (where Lake Ontario is the source of drinking water and the discharge point for treated wastewater). The 2025 Lake-Based Master Plan will provide an update to the previous 2020 Water and Wastewater Master Plan. The study area includes the City of Mississauga, the City of Brampton and parts of the Town of Caledon as shown in Fig.1.

Process

The study will be carried out in accordance with the Municipal Class Environment Assessment (MCEA) master planning process and will involve Phase 1 and Phase 2 of the MCEA process.

The objective of the Master Plan study are to:

  • Determine a preferred lake-based water and wastewater servicing strategy to address current servicing needs and accelerated growth driven by the Province’s Bill 23.
  • Align with the latest Council approved population and employment forecasts to 2051.
  • Assess potential growth post-2051 to inform long-term infrastructure planning.

Provide the business case for the need, timing and costs associated with servicing and infrastructure.

How Can I Participate in this Study?

Your Input is Important

Consultation and engagement with interested stakeholders, Indigenous Communities, and right holders is a key component of this Master Plan Study. One Public Information Centre (PIC) will be held to share the study process, its findings, outline the water and wastewater servicing strategies and present the preferred solution. The PIC will also provide an opportunity for participants to offer feedback to the project team.

The PIC will take place in person within each municipality, with information presented on display boards and staff available to answer questions and discuss next steps. Details for the PIC are provided below.

Information will also be available on the project website starting December 2, 2025.

VISIT the project website

PIC No. 1 Locations

Peel Region will be hosting three separate sessions for the PIC, scheduled as follows:

Municipality Date Time Location
City of Mississauga Tuesday, Dec 2, 2025 5:30 p.m. – 7:30 p.m. Paramount Fine Foods Centre, Meeting Room

5500 Rose Cherry Place, Mississauga ON L4Z 4B6

City of Brampton Wednesday, Dec 3, 2025 5:30 p.m. – 7:30 p.m. Region of Peel, Brampton and Caledon Room

10 Peel Centre Drive, Suite A, Brampton ON L6T 4B9

Town of Caledon Thursday, Dec 4, 2025 5:30 p.m. – 7:30 p.m. Caledon East Community Complex, Lion’s Den

6215 Old Church Road, Caledon East, ON L7C 1J7

Contact the Project Team

Italia Ponce, P.Eng.

Advisor, Water and Wastewater Strategic Infrastructure Planning

Peel Region

10 Peel Centre Drive, 4th Floor, Suite A

Brampton, ON L6T 4B9

italia.ponce@peelregion.ca

To be added to the mailing list or for general inquiries, please contact:

wwmasterplan@peelregion.ca

This Notice was first issued on November 13, 2025.

Peel Region is committed to ensure that all Regional services, programs, and facilities are inclusive and accessible. Please contact the Project Manager if you need any accommodations to provide comments and/or feedback for this study.

 

With the exception of personal information, all comments will become part of the public record of the study. The study is being conducted according to the requirements of the Municipal Class Environmental Assessment, which is a planning process approved under Ontario’s Environmental Assessment Act.