The City is developing new parks as part of Lakeview Village, a 177-acre mixed-use development on the eastern edge of Mississauga’s waterfront. This project will provide 18.5 hectares (45.73 acres) of new parkland, including:
– Ogden Park, a central open space connection
– Aviator Park and Waterway Common, parkland linkages across Lakeview Village
– Lakeview Square, an urban plaza
– Waterfront Park, connected to the landmark Cultural Pier, extending 350 meters into Lake OntarioThe City project page Developing parks in Lakeview Village is live and contains the virtual Public Information Centre (PIC) Webex information for the Waterfront Trail and Pedestrian Bridge Environmental Assessment.
– Aviator Park and Waterway Common, parkland linkages across Lakeview Village
– Lakeview Square, an urban plaza
– Waterfront Park, connected to the landmark Cultural Pier, extending 350 meters into Lake OntarioThe City project page Developing parks in Lakeview Village is live and contains the virtual Public Information Centre (PIC) Webex information for the Waterfront Trail and Pedestrian Bridge Environmental Assessment.
For the upcoming virtual Public Information Centre (PIC) meeting on June 12 from 6 to 7:30pm, please see meeting invite with the WebEx details below:
Join the meeting via Webex
https://mississauga.webex.com/mississauga/j.php?MTID=m79843cb2e2bcb2e76ad6b56f095f3416
Password: lakeview
Join the meeting by phone
Call 647-484-1596
Meeting number: 2317 085 5947
Meeting password: 52538439
Meeting number: 2317 085 5947
Meeting password: 52538439