SCHEDULED WATER SUPPLY INTERRUPTION NOTICE – 2303 Stanfield Rd – Friday, July 26th, 2:00am to 7:00am

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time: Friday, July 26th, 2:00am to 7:00am

Location:  2303 Stanfield Rd                               

Addresses Affected: Stanfield Rd: 2304, 2305, 2327, 2330, 2332, 2340, 2345, 2362, 2396, 2403

Queensway E: 921, 1105, 1185, 1195, 1215, 1225, 1235, 1075

Middlegate: 988, 1000                                  

Project #:  C-474290

Regional Inspector: Phemelo Mpoloka

Telephone #               437-220-8917

905-791-7800 ext. 3246/3247    

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Friday, July 26th, 2:00am to 7:00am. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

           

MiWay Notice of Detour: Closures at Hurontario and Mineola | Starting July 25

By Hurontario LRT, Resources, Ward 1

Location of Impact: Hurontario St and Mineola

Date and Time: Thursday, July 25th, 2024 at 10PM

Estimated Duration: Until further notice

Routes Impacted: 8 South

Impacted Stops:

  • 0367, 0368, 0854, 0369, 0370, 0371, 0372, 0373, 0374, 0375, 0376, 0335, 0337, 0339
  • One additional temporary stop will be added in the South Bound direction on the North West corner of Cawthra and Atwater

Event Type: HuLRT – Centre Guideway Works

Agency: Mobilinx

Notes: Left turns are restricted from WB Mineola onto Hurontario

SCHEDULED WATER SUPPLY INTERRUPTION NOTICE – Thursday, July 25th, from 9:00am to 5:00pm – 887 Beechwood Ave

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time: Thursday, July 25th, from 9:00am to 5:00pm

Location:  887 Beechwood Ave                            

Addresses Affected: 504 Lakeshore Rd E

864-970 Beechwood Ave

492-529 Richey Cres

875 Enola Ave                    

Project #:  C-603997

Regional Inspector: Phemelo Mpoloka

Telephone #               437-220-8917

905-791-7800 ext. 3246/3247

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Thursday, July 25th, from 9:00am to 11:00am. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

SCHEDULED WATER SUPPLY INTERRUPTION NOTICE – Tuesday, July 23rd, from 9:00am to 5:00pm – 1077 Serson Ave 

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time: Tuesday, July 23rd, from 9:00am to 5:00pm

Location: 1077 Serson Ave                            

Addresses Affected: Serson Ave: 1074, 1079, 1080 1081, 1086, 1089, 1090, 1093                            

Project #:  C-603964

Regional Inspector: Phemelo Mpoloka

Telephone #               437-220-8917

905-791-7800 ext. 3246/3247

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Tuesday, July 23rd, from 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

 

Heavy rains release partially treated wastewater into Lake Ontario

By Announcement, Resources, Ward 1

BRAMPTON, ON (July 16, 2024) – Due to recent heavy rains and subsequent flooding, an overflow of partially treated wastewater from the G. E. Booth wastewater treatment facility has been released into Lake Ontario. The exact amount of water is unknown at this time. Partial bypasses are common during high rainfall events.

The drinking water supply remains clean and safe for consumption. Our water treatment facilities are operating effectively, ensuring the highest standards of water quality.

Heavy rains can flush pollutants into water bodies. Residents are advised to refrain from swimming or engaging in any water-related activities along the Lake Ontario beaches in Mississauga until further notice. Please check the beach water testing site for the most recent results.

Peel Region is closely monitoring the situation and will provide updates as more information becomes available. We encourage residents to stay informed through our official communication channels.

Watermain Construction Project – 1541 to 1590 Haig Boulevard & 1616 Haig Boulevard – Thursday July 18th between 9 a.m. and 5 p.m

By Resources, Ward 1

For the watermain construction project 22-1395, residents will experience interruptions to their water supply on Thursday July 18th between 9 a.m. and 5 p.m.  Approximately 13 houses and 1 townhouse complex with 50 homes will be affected at:

  • 1541 to 1590 Haig Boulevard
  • 1616 Haig Boulevard

Please send any questions to construction@peelregion.ca .  This will allow our customer service team to direct the inquiry to the relevant staff and log it to inform future service enhancements.

UPDATE Metrolinx Notice – Construction Impacts

By Announcement, Hurontario LRT, Ward 1
Metrolinx Notice: Upcoming Construction Impacts

As construction on the Hazel McCallion Line progresses, crews will be welding tracks and doing concrete work for guideway installation within the intersection of Hurontario Street and Mineola Road. This work is scheduled to begin Thursday July 25th, 2024, at 10pm, until Wednesday August 28, 2024, at 10pm.

During this work, east-west traffic will be prohibited at Mineola Road, across Hurontario Street in each direction. Left turns will also not be permitted in the intersection.

Detours for eastbound traffic along Mineola Road are available via Woodland Avenue, Inglewood Drive, Oriole Avenue, and Eaglewood Boulevard at the new signalized intersection to cross Hurontario Street. Detours for westbound traffic along Mineola Road are available via Broadmoor Avenue, Windy Oaks, Crossfield Bend, and Eaglewood Boulevard at the new signalized intersection to cross Hurontario Street.

Transit services will be impacted by these construction works, including a detour for MiWay Route 8. Please visit www.miway.ca/updates for updates on your bus route.

In an effort to expedite the work at Mineola and Hurontario, our crews will be working continuously overnight on the intersection guideway starting Monday August 12th to Friday August 23rd. At that point, all guideway and track installation work will be within the hours of 7am to 5pm.

While we understand, this is very inconvenient to the community, this expedited effort will ensure the work is completed and the intersection will be fully open in time for the start of the new school year.

Traffic signal timings will be adjusted to keep people moving. Pedestrian crossings will be maintained at a signalized crosswalk. Please follow the signs installed to assist with navigating around the closure.

 

16-2300C1 Road closure Notice – Mattawa Avenue – July 17,2024

By Announcement, Resources, Ward 1

NOTICE OF TEMPORARY ROAD CLOSURE
Watermain and Sanitary Sewer Replacement and Improvement
Mattawa Avenue

Peel Region has been working in your neighbourhood to replace the watermain and install a new sanitary trunk sewer along Mattawa Avenue. This work is required to maintain and improve existing water and wastewater services. At this stage in the project, a temporary road closure will be required to complete this work.

Traffic impacts
• Mattawa Avenue will be closed to all through traffic from Dundas Street East to Loreland Avenue. This temporary road closure is expected to occur from July 17, 2024 until June 27, 2025. A detour route will be clearly marked with road signs. Please see the attached map for the detour route.
• Access to businesses will be maintained. No through traffic will be allowed and there will be no on-street parking.
We apologize for any delays or inconvenience resulting from these traffic impacts.

Keeping you informed
Weather and other unpredictable events may change the date of these traffic impacts. Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup to start signing up.
Information on this construction project can also be found at peelregion.ca/construction/project-16-2300C1

Safety during construction
Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water and wastewater services. If you have any questions, please contact us.

Water Linear Engineering & Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca