Project Update: Adamson Estate Boardwalk Replacement

Please be advised that the work to replace a pedestrian boardwalk (map below) in Adamson Estate Park (P-169) will begin later this week, as part of City’s annual bridge program.

The work includes the replacement of the existing boardwalk, footings and site restoration.

The unpaved trail and boardwalk is closed this week, and Parks aims to reopen the trail section in July.

As this boardwalk is situated parallel and in close proximity to the main multi-use trail, there will be very limited impact to pedestrian circulation in the area.

We have posted Service Disruption Signs with alternative routes along the trail.