Location of Impact: Dixie Rd and Queen Elizabeth Way (QEW)
Date and Time: Wednesday September 4, 2024
Estimated Duration: Until Further Notice
Routes Impacted: 5 South
Impacted Stops: #0426 Dixie Outlet Mall Bus Terminal Platform B
Additional Stops: One temp stop will be provided on the NW corner of Dixie Rd and South Service Rd
Event Type: Interchange Rehabilitation
Agency: Amico Infrastructure Inc.
Notes:
- Left turn restrictions at Dixie Rd and South Service Rd
Peel’s garbage exemption coming soon
BRAMPTON, ON (September 3, 2024) – Peel’s garbage exemption period is coming up.
To find your garbage exemption day:
- Check your collection calendar.
- Sign up to receive free weekly collection reminders by email, text message, or phone call.
During a garbage exemption pickup:
- You can put any amount of acceptable garbage on the curb.
- Garbage tags are not needed.
- Extra garbage is collected only on your garbage collection day, not on your recycling collection day.
To be picked up, an extra garbage bag cannot:
- Weigh more than 20 kg (44 lbs).
- Be larger than 66 cm (26 in) wide and 90 cm (35 in) high.
- Be smaller than 30 cm (12 in) wide and 30 cm (12 in) high.
To find out more about Peel’s garbage exemption, visit our website.
The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.
Your water will be turned off on Friday, Sept 6th, 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
- Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
- Notify the fire alarm company if the interruption could affect an alarm system.
- Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.
After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- 905-791-7800 extension 4409 (after hours or statutory holidays)
If you have any questions, please contact us.
Construction Inspections
Engineering Technical Services Division
Operations Support, Public Works
Email: zzgetsdevadmin@peelregion.ca
Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)
Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)
INTERRUPTION DETAILS
Date and Time: Friday, Sept 6th, 9:00am to 5:00pm
Location: 953 & 957 Halliday Ave
Addresses Affected: 939 Halliday Ave to 1302 Meridith Ave
Project #: C-602803
Regional Inspector: Phemelo Mpoloka
Telephone # 437-220-8917
905-791-7800 ext. 3246/3247
Bring your unbound paper – such as taxes, bills, income statements and personal information – to a Community Recycling Centre (CRC) for free shredding on designated days in 2024.
- There is no limit to how much paper you can bring.
- To avoid long lineups, you cannot stay and watch your documents being shredded.
- Regular disposal fees apply to all other items.
Fall paper shredding events:
Fewster Community Recycling Centre
September 7, 2024
8:30 a.m. – 4:30 p.m.
Bolton Community Recycling Centre
September 14, 2024
8:30 a.m. – 4:30 p.m.
Heart Lake Community Recycling Centre
September 21, 2024
8:30 a.m. – 4:30 p.m.
Support local food banks with a donation
Consider bringing one or more non-perishable food items (such as canned vegetables, soups and packages of pasta) to the event along with your papers.
The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we work on the system or conduct tests. Hydrants will also be bagged and out of commission in the area during this time.
Between 11:00pm on Thursday, September 5th, and 7:00am Friday, September 6th, please expect a brief water outage (approximately 15 minutes) and loss of water pressure while we work in your area. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
- Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
- Notify the fire alarm company if the interruption could affect an alarm system.
- Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.
After the test shutdown
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- 905-791-7800, extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- 905-791-7800 extension 4409 (after hours or statutory holidays)
If you have any questions, please contact us.
Construction Inspections
Engineering Technical Services Division
Operations Support, Public Works
Email: zzgetsdevadmin@peelregion.ca
Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)
Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)
INTERRUPTION DETAILS
Date and Time: From Thursday, September 5th, 11:00pm to Friday, September 6th, 7:00am.
Location: Lakeview Village, Mississauga.
Affected Addresses:
1083 Rangeview Road
985 Hydro Road
1076 ,1050, 1036, 1000, 974, 946, 920, 910, 896, 880, 872, 866, 860, 852, 848 Lakeshore Road East
Project #: T-19001Ma
Regional Inspector: Walid Bhunnoo
Telephone # (289) 541-6186
905-791-7800 ext. 3246/3247
The 2025 Culture and Community Grants program is now open for applications.
August 26, 2024
- Arts and Culture Grant
- Community Grant
- Cultural Festivals and Celebrations Grant
- Culture Projects Grant
- Small Projects Matching Grant
Guidelines featuring eligibility requirements and application directions are available on the grants webpage. All applications must be submitted no later than October 11, 2024 by 4:30 p.m. online.
Interested applicants are invited to attend an information webinar to learn more about the grants and ask questions about the application process. Grant information webinars are scheduled for the following days:
Arts and Culture Grant and Culture Project Grant
Community Grant and Small Project Matching Grant
Cultural Festivals and Celebrations Grant
For additional support, please contact grantsinfo@mississauga.ca to arrange a meeting with City staff to discuss your application and verify eligibility.
For more information, visit the grants webpage.
The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.
Your water will be turned off on Wednesday, August 28th, from 9:00 p.m. to Thursday, August 29th, 6:00 a.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
- Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
- Notify the fire alarm company if the interruption could affect an alarm system.
- Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.
After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- 905-791-7800 extension 4409 (after hours or statutory holidays)
If you have any questions, please contact us.
Construction Inspections
Engineering Technical Services Division
Operations Support, Public Works
Email: zzgetsdevadmin@peelregion.ca
Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)
Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)
INTERRUPTION DETAILS
Date and Time: Wednesday, August 28th, from 9:00 p.m. to Thursday,
August 29th, 6:00 a.m.
Location: 2303 Stanfield Rd and Queensway E
Addresses Affected: 1000 Middlegate Rd, 921, 1035, 1075, 2303, 2304 Queensway E
Project #: C- 474290
Regional Inspector: Phemelo Mpoloka
Telephone # 437-220-8917
905-791-7800 ext. 3246/3247
The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.
Your water will be turned off on Friday, August 30th, 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
- Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
- Notify the fire alarm company if the interruption could affect an alarm system.
- Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.
After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- 905-791-7800 extension 4409 (after hours or statutory holidays)
If you have any questions, please contact us.
Construction Inspections
Engineering Technical Services Division
Operations Support, Public Works
Email: zzgetsdevadmin@peelregion.ca
Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)
Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)
INTERRUPTION DETAILS
Date and Time: Friday, August 30th, 9:00am to 5:00pm
Location: 1088 & 1092 Casson Ave.
Addresses Affected: 1070 to 1100 Casson Ave.
Project #: C-603272
Regional Inspector: Phemelo Mpoloka
Telephone # 437-220-8917
905-791-7800 ext. 3246/3247
The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.
Your water will be turned off on Tuesday, August 27th, 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
- Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
- Notify the fire alarm company if the interruption could affect an alarm system.
- Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.
After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- 905-791-7800 extension 4409 (after hours or statutory holidays)
If you have any questions, please contact us.
Construction Inspections
Engineering Technical Services Division
Operations Support, Public Works
Email: zzgetsdevadmin@peelregion.ca
Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)
Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)
INTERRUPTION DETAILS
Date and Time: Tuesday, August 27th, 9:00am to 5:00pm
Location: 1291 Mineola Gardens
Addresses Affected: 1256 to 1300 Mineola Gardens
351 Atwater Ave.
Project #: C-603596
Regional Inspector: Phemelo Mpoloka
Telephone # 437-220-8917
905-791-7800 ext. 3246/3247
