NOTICE OF PUBLIC INFORMATION CENTRE NO. 2 – Port Credit East Water and Wastewater Servicing Optimization Strategy

By May 12, 2022July 11th, 2022Issues, Resources, Ward 1

NOTICE OF PUBLIC INFORMATION CENTRE NO. 2
Port Credit East Water and Wastewater Servicing Optimization Strategy
Schedule C Class Environmental Assessment

New Name! This study has been updated to include a new watermain component.

Background:
The existing sanitary pumping stations (Elmwood, Hiawatha, and Rosemere) and some of the sanitary sewer mains and watermains in the general Port Credit East area are experiencing operational challenges.
The Region of Peel initiated this Municipal Class Environmental Assessment (EA) to develop an integrated and optimized servicing strategy to me

et the needs of the existing community and provide for future growth.

Process:
This study follows a Schedule C Class EA process including:
• Public and agency stakeholder engagement.
• Looking at ways to improve and optimize the water and wastewater systems.
• Investigating alternative long-term servicing strategies, construction methodologies and design concepts and their potential impacts and mitigation needs.
• Confirming the preferred solution including alignments, siting, design, and construction timing.

Your Input is Important:Three Public Information Centres (PICs) will be held to present the findings of the Class EA and to provide an opportunity
to give feedback to the project team.

PIC No. 2 (Virtual):
This PIC is being held virtually and will present the alternative sites and route alignments evaluated for the water and wastewater study components. Secondly, this PIC will present the selected preliminary preferred servicing strategies for the following study components:
• New Lakeshore Road Deep Trunk Sewer.
• New Lakeshore Road Sub-transmission Watermain.
• Rosemere, Elmwood, and Hiawatha Sewage Pumping Stations.

All content and instructions on how to submit questions and feedback on this material will be posted on the project website. Access the website using the link below or by scanning the QR code with your smartphone: https://www.peelregion.ca/public-works/environmentalassessments/ mississauga/port-credit-east-wastewater.asp.
Project information, including the evaluated water and wastewater servicing alternatives will be posted on the project website on May 18, 2022. This will be followed by a two-week question
submission period closing June 1, 2022.

Contact:
If you wish to submit comments or would like to be added to the project mailing list for future project notifications, please contact the Project Manager listed below. The Region of Peel is committed to ensure that all Regional services, programs and facilities are inclusive and accessible. Please contact the Project Manager if you need accommodations to provide comments or feedback for this study.

Italia Ponce, P.Eng., Project Manager
10 Peel Centre Drive
Brampton, ON, L6T 4B9
905-791-7800 ext. 4583
italia.ponce@peelregion.ca