NOTICE OF PRE-DESIGN FIELD INVESTIGATION
Beach Street Sewage Pumping Station Diversion Aviation Road, Caven Street, East Avenue, Hampton Crescent, Lakeshore Road East, and Lakeside Avenue
Peel Region is undertaking investigations related to the installation of a new sanitary sewer system in your area. Sanitary sewers are underground pipes that carry wastewater from your home to a wastewater treatment plant. Wastewater is created when water goes down the drain or is flushed down the toilet. As pipes age and our population grows, we need to repair and replace older sewers to keep providing high quality wastewater services to you.
As we plan for future construction, we will be in your neighborhood conducting field investigations along Aviation Road, Caven Street, East Avenue, Hampton Crescent, Lakeshore Road East, and Lakeside Avenue.
• We will survey your street and use temporary spray paint or flags to mark the location of underground gas, hydro, and cable on roads, driveways, and lawns.
• We may drill holes to collect soil samples, determine ground conditions, or confirm utility locations. These holes may be drilled in the road or the municipal right-of-way, the land owned by the municipality between the street and your water service box. (A water service box is a small, round metal valve in your driveway or lawn that typically marks your front property line.)
• We will take pictures and record video to help ensure that we restore the area as close as possible to its former condition, after construction takes place.
We expect these activities to take place between July 2024 and May 2025.
Contractor and working hours
The work will be completed by various contractors under contract to Peel Region. The contractors normal working hours are from 7 a.m. to 7 p.m., Monday to Friday. These hours are consistent with the City of Mississauga bylaws.
Traffic impacts
There may be minor traffic disruptions during these activities. If we must reroute traffic, we will place signs giving directions.
Staying informed
To receive updates on Peel Region construction projects in your area, sign up for e-notices at peelregion.ca/construction/signup to start signing up.
Information on this project can be found at https://peelregion.ca/construction/project-16-2905-7/
Thank you for your patience during this work. If you have any questions, please contact us.
Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409