Resources

Construction Notice – Sanitary Sewers Project – April 28th to May 9th, 2025 – Wharton Way, Wharton Glen Avenue and Mattawa Avenue Mississauga

By Construction, Resources

Peel Region will be working in your neighborhood to rehabilitate the existing sanitary sewer system on Wharton Way, Wharton Glen Avenue and Mattawa Avenue under the City of Mississauga. Sanitary sewers are underground pipes that carry wastewater from your home or business to a water resource recovery facility. Wastewater is created when water is flushed down the toilet, or goes down the drain in your sink, tub, or shower.

To extend the service life of the sewer under your street, Peel Region’s contractors will clean the existing sewer pipe and place a new resin (plastic) lining within it. This work will be completed underground with specialized equipment and will not require digging trenches in your community. It is allowed to take place overnight (between 7pm to 7 am) to reduce the impact of our work.

Construction Schedule:

This work is expected to take between April 28th to May 9th, 2025. Monday to Friday. Additional nights may be required due to unexpected events, such as poor weather conditions. A 48-hour notice will deliver to your place of business to give you advance notice of the work date.

We may need to temporarily close roads or reduce traffic to a single lane. If this is needed, we will place signs giving directions. On-street parking will be reduced when we are working on your street.

Traffic and Parking:

This work will be phased to minimize disruption to traffic. At least one lane will be open in each direction during this work. On-street parking will be reduced when we are actively working on your street. Access to businesses will be maintained.

Noise:

We do not expect significant noise or vibrations above normal daytime construction levels during this time. Efforts will be made to reduce impacts to local residents.

Odors:

You may smell some odors while the synthetic resin inside the sewer cures. These odors are temporary and will dissipate within a few hours. You can prevent or minimize these odors by making sure you have water in all of your drains, including your basement floor drain. We recommend pouring a bucket of water down the floor drain and running the water in all sinks, showers, and tubs for a minute, either the evening before or day of the relining work. If you are not able to put water down your floor drain (for example, if it is currently covered by flooring).

We strongly recommend making it accessible before relining work begins to reduce the level of odors in your home or business.

Construction Safety:

Construction zones require extra caution to keep everyone safe. Be aware of your surroundings when driving, walking, or biking near the construction area. Watch for construction crews and other road users, slow down, and consider other routes. Visit peelregion.ca/workzonesafety for more information.

Project information can be found at peelregion.ca/construction/project-23-2300E1

Contractor and Working Hours

The work will be completed by Capital Sewers, supported by Andrews Engineer under contract to Peel Region. This contractor’s normal working hours are from 7 pm. to 7 a.m., Monday to Friday. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but shorter working days would require this work to affect your community over a longer period of time.

Wastewater Service Interruptions:

To complete this work, your wastewater service pipe will be out of service (plugged) for approximately 12 hours. (Wastewater service pipes carry wastewater from your home or business to the underground sanitary sewer system.) This temporary service interruption allows for the pipe to be repaired without digging up the street. To advise you of the exact date and time of this service interruption, Capital Sewers will provide you with a second notice at least 24 to 48 hours before the lining process begins.

It is important to minimize your water use while the sewer work is underway:

• You may continue to wash your hands but minimize your water use.
• Do not use showers, bathtubs, dishwashers, your washing machine or any other heavy water use like back wash processes.
• Keep toilet flushing to a bare minimum.

These actions will reduce the possibility of wastewater (also known as sewage) backing up into your basement or into your plumbing. If you have a sump pump, please notify us at construction@peelregion.ca or tell the contractor when they arrive at your property.

 

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality wastewater services.

If you have any questions, please contact us:

Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

 

Free Confidential Paper Shredding Returns This May

By Announcement, Resources

BRAMPTON, ON (April 22, 2025) – Peel Region is offering residents free confidential paper shredding at select Community Recycling Centres (CRCs) on the following dates:

  • May 10: Fewster CRC
  • May 24: Bolton CRC
  • May 31: Heart Lake CRC

Paper shredding on these dates will be available during the regular business hours of 8:30 a.m. to 4:30 p.m.

Residents can bring unbound paper documents such as taxes, bills, income statements and personal information.

To keep traffic flow moving quickly and efficiently, visitors will not be able to stay and watch their documents be shredded. Along with your papers, we encourage residents to bring non-perishable food items to donate to a local food bank.

Regular fees apply to all other items brought to the CRC for disposal.

Notice – Hazel McCallion Line General Construction Updates

By Construction, Resources

As construction on the Hazel McCallion Line Light Rail Transit progresses, communities in Mississauga South can expect the following construction activities in the coming months:

  • Road widening activities on the east side of Hurontario Street, including construction of the multi-use path.
  • Civil works will realign Oriole Avenue further east, between Eaglewood Boulevard and Inglewood Drive, adjacent to the new Mary Fix Creek floodwalls.
  • Installation of guideway and track works connecting Port Credit Station and Eaglewood along the west side of Hurontario Street.
  • Removal of old telecommunication and hydro poles along the west side of Hurontario to help facilitate the permanent restoration of driveways and exiting boulevard.
  • Installation of new hydro poles and the pulling of overhead and underground electrical cables, connecting adjacent properties to the new hydro infrastructure with temporary power outages
  • Installation of permanent traffic signals at Park Street, Mineola Road, Indian Valley/Pinewood Trail and Pinetree Way intersections.

 

As construction staging moves to the center of the roadway for guideway, track, and LRT stop construction, we remind the motorists that permanent turning restrictions will be implemented to ensure the safe flow of traffic.

 

Most work is scheduled from Monday to Saturday from 7 a.m. to 7 p.m. and will take place within the staged area separated by traffic barrels and temporary fencing.  Temporary closures of roadways at intersections will be required to ensure that crews onsite are able to safely complete the work. Some overnight and weekend work may also be required. Additional notification will be provided when there is a requirement for a temporary road closure, overnight, or Sunday work. We will also communicate with individual property owners concerning potential property access requirements such as temporary power outages, utility connections, and temporary driveway closures for final restoration and boulevard grading. Additional signage will also be placed to inform motorists and pedestrians about any sidewalk closures or changes to traffic configuration.

 

The attached construction notice has been posted on our website and will be hand delivered to residents in the area over the coming weeks.

Water Interruption Notice – Wednesday, April 23rd, From 9:00am To 5:00pm – 1081 Searson Avenue Mississuga

By Resources

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday, April 23rd, from 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

INTERRUPTION DETAILS

Date and Time: Wednesday, April 23rd, 9:00am to 5:00pm

Location:  1081 Serson Avenue

Addresses Affected: 1074 – 1093 Serson Avenue,  1217 and 1227 Strathy Avenue Mississauga, ON                        

Project #:  C-604062

Regional Inspector: Phemelo Mpoloka

Telephone #  437-220-8917

905-791-7800 ext. 3246/3247

Get Your Batteries Ready For Pickup

By Resources

BRAMPTON, ON (April 14, 2025) – Peel Region will be collecting single-use and rechargeable batteries at the curb starting April 21.

Check your waste collection calendar to find your battery pickup day.

Here’s how to prepare and set out your batteries for collection:

  • Put your used single-use and rechargeable batteries in a transparent, sealed bag.
  • Tape the ends of all rechargeable and 9V batteries.
  • On your battery pickup day, place your battery bag on top of your closed green bin. If you don’t have a green bin, place your battery bag beside your recycling bags.

Thanks to Peel residents, we’ve collected more than 240,000 kgs of batteries that could have otherwise ended up in the landfill.

If you miss your battery pickup day, don’t worry. Check RecycleYourBatteries.ca to find a free drop-off location near you to safely dispose of used and old batteries throughout the year. You can also drop off batteries for free year-round at any Community Recycling Centre near you.

Batteries should never be put in your garbage, recycling, or organics bins – they can cause fires in collection trucks and at facilities, putting workers at risk. By properly disposing of batteries, you’re helping to keep hazardous materials out of landfills, protecting our environment and our Peel community.

Good Friday Holiday Service Hours At Peel Region

By Announcement, Resources

BRAMPTON, ON (April 14, 2025) – Peel Region offices and non-emergency services will be closed for the Good Friday holiday on Friday, April 18, 2025.

The following non-emergency services are closed and will reopen on Monday, April 21, 2025:

  • Service Peel Counters
  • ServiceOntario Counter
  • Dental Services Contact Centre and Dental Clinics
  • Family Health Call Centre
  • Healthy Sexuality Clinics (with the exception of the Meadowvale Healthy Sexuality Clinic, which will reopen on Tuesday, April 22, 2025)

Peel Works Harm Reduction mobile vans will be closed on Friday, April 18, 2025, and return to regular operating hours on Saturday, April 19, 2025.

Human Services

Early Years and Child Care Services will be closed on Friday, April 18, for Good Friday and will reopen on Monday, April 21. Child Care Subsidy will be closed on Good Friday and Easter Monday and will reopen on Tuesday, April 22.

Housing Services, Client Services will be closed on Friday, April 18 (Good Friday) and Monday, April 21 (Easter Monday) and will reopen on Tuesday, April 22.

Ontario Works will be closed on Friday, April 18 (Good Friday) and Monday, April 21 (Easter Monday) and will reopen on Tuesday, April 22.

Emergency shelter, food, or personal support

For urgent homelessness supports, including food, supplies, referrals, and shelter, call the Street Helpline 24/7 at 1-877-848-8481. For information on emergency shelter, visit the emergency shelter webpage or call 905-450-1996.

Emergency Peel Living Maintenance Requests

For emergency Peel Living maintenance requests, contact the 24-hour request line at 905-790-7335.

Vaccination Clinics

Routine school immunization clinics will be closed on Friday, April 18, 2025, and Monday, April 21, 2025. To check for available clinics and to book your appointment, visit routine school immunization.

TransHelp

To travel on Friday, April 18, and Saturday, April 19, you must call 905-791-1015 or book online by 7 p.m. on Thursday, April 17.

On Friday, April 18 (Good Friday)

  • Call us at 905-791-1015 if you need to cancel your trip.
  • Flexible (same-day) trips will not be provided.
  • All subscription trips will be cancelled, with the exception of dialysis trips.
  • TransHelp will operate from 6 a.m. to 1 a.m.
  • The TransHelp office will be closed and unable to process applications, payments, or feedback.

We offer bookings up to 7 days in advance. Consider booking your next trip early to ensure your holiday travel.

Email transhelp@peelregion.ca or call 905-791-1015 with any questions.

Public Transit

Visit Brampton Transit and Mississauga Transit for holiday schedules.

Waste Collection

There will be no change to your waste collection schedule due to Good Friday. Check your collection calendar to find your pickup day or sign up to receive free waste collection reminders.

All Community Recycling Centres (CRCs) will be closed on Friday, April 18, Sunday, April 20, and Monday, April 21. CRCs will be open on Saturday, April 19, and will resume regular operations on Tuesday, April 22.

Peel Art Gallery, Museum and Archives (PAMA)

PAMA will be closed on Friday, April 18, 2025. We welcome visitors to explore our historic spaces on Monday, April 21, for a family fun activity to celebrate Spring. Admission will be complimentary throughout April, courtesy of the Sikh Foundation of Canada.

Water Interruption Notice – Tuesday, April 15th, from 9:00am to 5:00pm – 31 Inglewood Drive Mississauga

By Resources

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Tuesday, April 15th, from 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

INTERRUPTION DETAILS

Date and Time:   Tuesday, April 15th, 9:00am to 5:00pm

Location:  31 Inglewood Drive

Addresses Affected: 22 – 76 Inglewood Drive

Mississauga, ON

Project #: C-603601

Regional Inspector: Phemelo Mpoloka

Telephone # 437-220-8917

 905-791-7800 ext. 3246/3247

Notice Of Controlled Burn Near The Future Jim Tovey Lakeview Conservation Area – April 10, 2025

By Planning & Development, Resources

Purpose:

Credit Valley Conservation (CVC) is committed to keeping you informed of activities at the future Jim Tovey Lakeview Conservation Area, 1300 Lakeshore Road East, Mississauga.

This letter is to inform you we are planning a controlled (prescribed) grassland burn on 1.55-hectare (3.83 acre) portion of the property (Figure 1). There is no public access to the park, but smoke may be seen in the area.

Figure 1. Location of the Jim Tovey Lakeview Conservation Area and the burn area within it.

What Is A Controlled Burn?

Controlled burns are fires that are carefully set and managed to create, maintain and protect prairie and grassland habitat. The burns are done in a way that helps native plants grow, while minimizing impacts to wildlife.

Why Are We Doing This?

The goal is to remove invasive, non-native plants so a healthy native grassland with diverse species can establish and thrive.

How Will The Burn Be Controlled?

CVC has contracted Lands and Forests Consulting (LFC) to carry out the controlled burn. The controlled burn will follow a detailed plan prepared by LFC. The plan covers all aspects of the burn process and has been approved by the City of Mississauga Fire and Emergency Services. Please contact us if you want a copy of the burn plan.

LFC has over 20 years of burn experience and has completed over 400 incident-free, successful burns. They hold provincial wildland firefighting standards certification. A Certified Level 3 Burn Boss will supervise the burn. Additional staff certified to nationally recognized firefighter standards will also be on site to implement the burn and manage any issues that arise. CVC staff will also be present on site.

When Will The Controlled Burn Take Place?

The one-day burn will take place between April 14th and May 2nd and will be completed in approximately one hour.

CVC staff and LFC will determine the ideal date and time to conduct the burn, based on site and weather conditions.

How Will Residents And Businesses Be Notified About The Controlled Burn?

  • A ‘notice to neighbours’ will be delivered to neighbouring residents and businesses
  • Signs/notices will be posted along Lakeshore Road East
  • Information posted on our website at cvc.ca/jtlca
  • CVC’s social media platforms: X @CVC_CA and Facebook @CreditValleyConservation

What Do Residents And Businesses Need To Do During The Controlled Burn?

LFC will apply techniques to minimize smoke and control its movement in the air. However, changing weather conditions may cause smoke and briefly impact nearby homes and businesses. We have advised residents to close windows on the day of the burn. People with sensitivity to smoke are encouraged to stay indoors at the time of the burn.

Connect With Us For More Information:

We’ll share information and updates about the controlled burn on our website at cvc.ca/jtlca and on our social media platforms.

If you have any questions or concerns, please call me at 647-202-9830 or email aaron.root@cvc.ca.

Notice Of Study Completion, Port Credit Storm Drainage Master Plan

By Planning & Development, Resources, Ward 1

WHAT?

  • The City of Mississauga has prepared a Storm Drainage Master Plan for the Port Credit Neighbourhood. This Master Plan was developed to assess how much stormwater the current drainage system can handle and to identify any potential problems with the system, caused by increased development in the area and the effects of climate change. The Master Plan has recommended storm sewer upgrades and recommended opportunities for local Low Impact Development (LID) Best Management Practices (BMPs).

WHY?

  • In the recent years, the Port Credit Neighbourhood has been subject to infill and intensification which may put greater pressure on the stormwater system.
  •  No recent evaluations\assessments of the drainage system capacity had been completed. Accordingly, this Study was completed to determine the current and future storm drainage infrastructure requirements for the area to prepare a roadmap for future action.
    HOW?
  • Detailed modelling of existing drainage systems was conducted to identify a comprehensive program for the City’s drainage infrastructure.
  • Potential options were evaluated for managing stormwater drainage in the Port Credit Neighbourhood along with priorities for the implementation of the overall preferred solution, consisting of three (3) separate projects.

PORT CREDIT STORM DRAINAGE MASTER PLAN FOR REVIEW

  • A key component of this Study was to consult with regulatory agencies, the public, interested stakeholders and Indigenous Peoples & Nations whose Traditional Territory the Study Area is located in.
  • Two virtual Public Information Centres (PICs) were held throughout the Study process to present initial Study findings, alternatives, the preferred solution and to answer any questions.
    The Storm Drainage Master Plan is being placed on the public record (project website) for review starting April 7, 2025, to May 6, 2025: https://www.mississauga.ca/projects-and-strategies/environmental-assessments/port-credit-storm-drainage-master-plan/
  • Interested persons may provide written comments to the following project contacts by May 6, 2025:

Muneef Ahmad, P.Eng.
Manager, Stormwater Projects & Approvals
City of Mississauga
muneef.ahmad@mississauga.ca

Matt Senior, MASc. P.Eng.
Consultant Project Manager
WSP Canada Inc.
matt.senior@wsp.com

• Section 16 of the Environmental Assessment Act allows a person to submit a request to the Ministry of the Environment, Conservation and Parks to issue an order requiring a higher level of study (i.e., requiring an individual / comprehensive EA approval before being able to proceed), or that conditions be imposed (e.g., require further studies), only on the grounds that the requested order may prevent, mitigate or remedy adverse impacts on constitutionally protected Aboriginal and treaty rights. For Master Plans, this request would be possible only for those projects identified in the Master Plan, which are subject to the Class EA process, and not the Master Plan itself. The projects recommended through Storm Drainage Master Plan (i.e., storm sewer upgrades and LIDs) are not subject to Section 16 Order Request.