Stormwater Servicing Master Plan for Regional Road Infrastructure

By February 10, 2022February 14th, 2022Issues, Resources, Ward 1

NOTICE OF PUBLIC INFORMATION CENTRE NO. 2

Stormwater Servicing Master Plan for Regional Road Infrastructure

Background
The Region of Peel is implementing an infrastructure planning initiative to develop a Stormwater Servicing Master Plan for Regional Roads. The Stormwater Servicing Master Plan will provide a strategic, economical, and optimized vision that will guide the Region of Peel’s management of stormwater assets into 2041. The planning process will provide the Region with the information needed to develop appropriate solutions to service current and future growth that also addresses existing issues and the expected impacts of climate change.

Process
This study is being planned in accordance with the Master Planning process (Approach #1) as set out in Section A.2.7 of the Municipal Engineer Association (MEA) Class EA (October 2000, as amended in 2007, 2011 & 2015). This approach involves the preparation of a Master Plan document at the conclusion of Phase 1 and 2 of the Class EA process.

Your Input is Important
The Region wants to ensure that anyone with an interest in this study has the opportunity to be involved and to provide input. Your feedback is important and will help us refine the preferred solution.

Due to COVID-19 Provincial guidelines on physical distancing, the first in-person PIC was cancelled, however, the PIC#1 presentation materials were made available on the Region of Peel website:
https://www.peelregion.ca/pw/transportation/residents/sw-road-infrastructure.asp.

The second Public Information Centre (PIC) will be available online on February 17, 2022 and will include the presentation materials and a summary of the evaluation process used to determine the preliminary preferred solution. All content and instructions on how to submit questions and feedback will be outlined on the project website above. This will be followed by a three-week question submission period closing March 10, 2022. A formal response to all questions, comments and feedback will be posted on March 24, 2021.

Contact
To be added to the mailing list, provide feedback or to receive further information about the project, please contact:

Syeda Banuri, M.Eng., P.Eng., Project Manager
Region of Peel
10 Peel Centre Drive, Suite B, Brampton, ON, L6T 4B9
Phone: 416-407-7860
Email: syeda.banuri@peelregion.ca

James Jorgensen, B.SC., C.WEM, C.ENV, MIAM
GM BluePlan Engineering
3300 Highway No. 7, Suite 402, Vaughan, ON, L4K 4M3
Phone: 289-527-0570
Email: james.jorgensen@gmblueplan.ca

Follow us on Twitter @PeelPublicWorks for service updates.

The Region of Peel is committed to ensure that all Regional services, programs and facilities are inclusive and accessible for persons with disabilities. Please contact the Project Manager if you need any disability accommodations to provide comments or feedback for this study.
This notice was first issued on February 10, 2022