Update: Road Closure at Mineola Road West and Hurontario Street

Thursday August 11 to Monday August 15, 2022, 24-hour continuous work
Tuesday August 16 to Thursday August 18, from 7 a.m. to 10 p.m. each day

What work is taking place?

Construction crews will be installing utilities along Hurontario Street that will also need to cross Mineola Road. This will result in a temporary closure of a portion Mineola Road West.

In accordance with City of Mississauga Noise By-Law Exemption requirements, this notice is meant to advise that residents near the work site can expect to hear noise and vibration caused by trucks, excavators, backhoes, and other construction equipment related to this work. Some of this work will be done overnight and, on the weekend, so crews will be able to complete this work safely and efficiently.

Update: Due to unforeseen circumstances, the Mineola Road West closure is now scheduled to begin August 11, 2022. Works are scheduled to take place 24 hours a day from August 11 to August 15, and from 7 a.m. to 10 p.m. each day from August 16 to August 18. Due to nature of the work that requires a large open excavation, access for emergency vehicles will not be maintained during this closure.

The planned detour uses Indian Valley Trail and Glenburnie Road to access Mineola Road West (see above).

TIMING

 Mineola Road West will be closed from: o August 11 to August 15, 2022, for 24-hour continuous work. o August 16 to August 18, 2022, from 7 a.m. to 10 p.m. each day

 Work could be rescheduled and delayed due to weather conditions or unforeseen circumstances.

TRAFFIC DETAILS

 Access to Mineola Road West will be maintained through a detour from Hurontario Street, Indian Valley Trail, and Glenburnie Road.

 Watch for slow moving vehicles entering and exiting work areas.

 Remember to reduce your speed when approaching work zones.

WHAT TO EXPECT?

 Every effort will be made to minimize disruptions.

 Residents and businesses near the work site can expect to hear noise and vibration caused by trucks, excavators, loaders, triaxles, backhoes, and other construction equipment related to this work.

TRANSIT DETAILS

 MiWay near the intersection will continue to operate with regular service.

 Visit www.miway.ca/updates for updates.

 Watch for additional signs directing passengers at bus stop as boarding areas may be relocated.

PEDESTRIAN DETAILS

 Please take care when travelling near construction areas.

 Watch for additional signs directing pedestrians as detours may be required.

 Clear and defined walking paths will be maintained during construction to ensure pedestrian safety

CONTACT US

 Metrolinx has a dedicated community relations team in place to work with residents in Peel region through the construction and operation of this transformational transit project.

 24-hour line 416-202-7500.