INTERRUPTION DETAILS
Date: and Time: Monday, August 29th, 2022 from 9:00 a.m. to 5:00 p.m.
Location: 16 Maple Avenue N, Mississauga
Addresses Affected: 342 and 250 Lakeshore Road W
5 – 34 Maple Avenue S Read More
INTERRUPTION DETAILS
Date: and Time: Monday, August 29th, 2022 from 9:00 a.m. to 5:00 p.m.
Location: 16 Maple Avenue N, Mississauga
Addresses Affected: 342 and 250 Lakeshore Road W
5 – 34 Maple Avenue S Read More
Stop(s) Impacted: No.: 0332: NB Hurontario St at Pinewood Tr
Temporary Stop Location: Temporary platform to be relocated 150m to the South
Routes Impacted: 2 North
Date and Time: Effective Immediately
Estimated Duration: until Tuesday, September 6, 2022 @ 5:00pm
Event Type: HuLRT
Agency: Mobilinx
Notes:
– Stops will remain accessible;
– No detours required.
SCHEDULED WATER SUPPLY INTERRUPTION NOTIFICATION
Date: and Time: Thursday, August 25th, 2022 from 9:00 a.m. to 5:00 p.m.
Location: 52 Maple Avenue S, Mississauga
Addresses Affected:
28 – 63 Maple Avenue S
47 – 53 Pine Avenue S
Please be advised that the above will be filming exterior scenes for a TV Series “Pretty Hard Cases” at 2185 Greenhurst Ave (Ward 1) on August 24, 7:00 AM – 11:00 PM. Prep will be conducted on August 23, 7am-11pm and wrap on August 25, 7am-11pm.
A permit has been granted to allow parking on the following:
Tuesday August 23 to Tuesday August 30, 2022, 24-hour works Read More
Thursday August 11 to Monday August 22, 2022, 24-hour continuous work
TEMPORARY ROAD CLOSURE
MINEOLA ROAD WEST AT HURONTARIO STREET
HuLRT UTILITY INSTALLATION
The contractor is installing underground utilities at Hurontario Street and Mineola Road West. Due to the underground conditions, the duration of the temporary closure must be further extended. During the closure, no vehicles (including Emergency Services) will be able to access Mineola Road West from Hurontario Street. The signed detour uses Indian Valley Trail and Glenburnie Road to access Mineola Road West.
Variable Message Signs have been updated to advise motorists of the extended closure of Mineola Road West.
Mineola Road West at Hurontario – Temporary Road Closure Update
Should you have any questions or concerns, please contact the undersigned.
NOTE: Construction schedules are subject to change due to weather conditions and unforeseen construction conditions. Should the schedule require changes for any reason, an updated notice will be circulated.
INTERRUPTION DETAILS
Date and Time: Thursday, August 18th, 2022 from 9:00 a.m. to 5:00 p.m.
Location: 2056 Laughton Avenue, Mississauga
Addresses Affected:
2031 – 2080 Laughton Avenue
1616 Tarn Road
In preparation for the construction of the Hurontario LRT, the constructor must close Pinewood Trail just east of Hurontario Street to install an electrical duct bank.
During the closure, no vehicles (including Emergency Services) will be able to access Pinewood Trail from Hurontario Street. A signed detour will be erected that uses Mineola Road East and Goldthorpe Road to access Pinewood Trail.
Variable Message Signs will been installed to advise motorists of the planned closure and a copy of the notification letter that was hand delivered to residents in the area is attached.
The road closure will take place:
NOTE: Construction schedules are subject to change due to weather conditions and unforeseen construction conditions. Should the schedule require changes for any reason, an updated notice will be circulated.

What work is taking place?
Construction crews will be installing utilities along Hurontario Street that will also need to cross Pinewood Trail. This will result in a temporary closure of a portion Pinewood Trail from 7 a.m on August 16 to 5 p.m. on August 20, 2022. The road closure and construction will be continuous throughout this duration.
In accordance with City of Mississauga Noise By-Law Exemption requirements, this notice is meant to advise that residents near the work site can expect to hear noise and vibration caused by trucks, excavators, backhoes, and other construction equipment related to this work. Some of this work will be done overnight and, on the weekend, so crews will be able to complete this work safely and efficiently.
During this closure, motorists can access Pinewood Trail from Hurontario Street using the detour map provided. Please note, work may be rescheduled due to weather or unforeseen circumstances. If you require the most up-to-date information, please reach out to peel@metrolinx.com.
TIMING
Pinewood Trail will be closed from: o 7 a.m. August 16 to 5 p.m. August 20, 2022 o The road closure and construction work will be continuous throughout this duration
Work could be rescheduled and delayed due to weather conditions or unforeseen circumstances.
TRAFFIC DETAILS
Access to Pinewood Trail will be maintained through a detour from Hurontario Street, Mineola Road East and Goldthorpe Road.
Watch for slow moving vehicles entering and exiting work areas.
Remember to reduce your speed when approaching work zones.
WHAT TO EXPECT?
Every effort will be made to minimize disruptions.
Residents and businesses near the work site can expect to hear noise and vibration caused by trucks, excavators, loaders, triaxles, backhoes, and other construction equipment related to this work.
TRANSIT DETAILS
MiWay near the intersection will continue to operate with regular service.
Visit www.miway.ca/updates for updates.
Watch for additional signs directing passengers at bus stop as boarding areas may be relocated.
PEDESTRIAN DETAILS
Please take care when travelling near construction areas.
Watch for additional signs directing pedestrians as detours may be required.
Clear and defined walking paths will be maintained during construction to ensure pedestrian safety
CONTACT US
Metrolinx has a dedicated community relations team in place to work with residents in Peel region through the construction and operation of this transformational transit project.
24-hour line 416-202-7500.
Stop(s) Impacted: No.: 0333: SB Hurontario St at Mineola Rd W
Temporary Stop Location: Temporary marker to be placed 20m to the South
Routes Impacted: 2 South
Date and Time: Effective Immediately
Estimated Duration: until Friday, August 26, 2022 @ 5:00pm
Event Type: HuLRT
Agency: Mobilinx
Notes:
– Stops will remain accessible;
– No detours required.