New Water Service Connections to all Properties between the Lakeshore West Rail Bridge to Mineola Road – June 29, 2023 to July 29, 2023 from 7 a.m. to 10 p.m. with some overnight works

By Hurontario LRT, Resources, Ward 1

What work is taking place?

As utility upgrades progress in the area, crews will be connecting properties along Hurontario Street, between the GO Lakeshore West rail bridge and Mineola Road, to the new watermain infrastructure that has recently been installed along the road alignment. The work is expected to take place as early as June 29 and will last approximately one month to July 29. Crews will be working Monday to Saturday, from 7 a.m. to 10 p.m. In some instances, overnight work will be required at the direction of the Region of Peel for temporary water service disruptions during the connections.

All the connection points are within the municipal right of way. Most of the connection points are located within the municipal side of existing driveways or the public boulevard. To make these connections, crews will need to excavate a small area up to the property line. As a result, there may be temporary impacts to water service, driveway access, and lawns/trees/hedging that are in direct conflict with the connection points. All impacted driveways will be temporarily restored using hot mix asphalt until permanent restoration takes place with final grading and re-surfacing. Any disruption to lawns/trees/ hedging will be reinstated during the final landscaping phase of the project. Individual property owners/managers directly impacted will be notified by the Region of Peel in advance of the impacts specific to their water service connection.

In accordance with City of Mississauga Noise By-Law Exemption requirements, this notice is meant to advise that residents near the work site can expect to hear noise and vibration caused by trucks, excavators, backhoes, loaders, and other construction equipment related to this work.

All works will be carried out in accordance with the Ontario Municipalities Act for the purposes of providing a water public utility with respect to accessing private property as needed. For more information on this Act please visit the government of Ontario webpage on public utilities at https://www.ontario.ca/laws/statute/01m25#BK89

Please note, work may be rescheduled due to inclement weather or unforeseen circumstances. If you require the most up-to-date information, please reach out to peel@metrolinx.com.

TIMING

• Work is expected to begin as early as June 29, 2023, to July 29, 2023

• Working hours are Monday to Saturday, from 7 a.m. to 10 p.m. Some overnight works will be required at the direction of the Region of Peel.

• Work could be rescheduled and delayed due to weather conditions or unforeseen circumstances.

TRAFFIC DETAILS

• Watch for slow moving vehicles entering and exiting work areas.

• Remember to reduce your speed when approaching lane reductions.

WHAT TO EXPECT?

• Every effort will be made to minimize disruptions.

• There may be temporary impacts to water service, driveway access, lawns/trees/hedging that are in direct conflict with the connection points.

• Individual property owners/manager directly impacted will be notified by the Region of Peel in advance of the impacts specific to their water service connection.

• Residents and businesses near the work site can expect to hear noise and vibration caused by trucks, excavators, loaders, triaxles, backhoes, and other construction equipment related to this work.

TRANSIT DETAILS

• MiWay will continue to operate with regular service.

• Watch for additional signs directing passengers at bus stops as boarding areas may be relocated. Visit www.miway.ca/updates for updates on your route.

PEDESTRIAN DETAILS

• Please take care when travelling near construction areas.

• Sidewalk access in the area could be affected.

• Watch for additional signs directing pedestrians as detours may be required to ensure pedestrian safety.

CONTACT US

• Metrolinx has a dedicated community relations team in place to work with residents in Peel region through the construction and operation of this transformational transit project.

• 24-hour line 416-202-7500

Contact Us:
Call us: 416-202-7500
Write to us at: peel@metrolinx.com
Find us on Twitter @HurontarioLRT
Visit the website and sign up for our newsletter: www.metrolinx.com/hurontariolrt

SCHEDULED WATER SUPPLY INTERRUPTION NOTIFICATION RELATED TO CAPITAL WORKS CONSTRUCTION – Saturday June 24th, 2023 – 1405, 1456 to 1492 South Service Road and 1626 Park Royale Road

By Resources, Ward 1

INTERRUPTION DETAILS

Date: Saturday June 24th, 2023
Time: Intermittent interruptions between 9:00 a.m. to 5:00 p.m.
Location: 1405, 1456 to 1492 South Service Road and 1626 Park Royale Road
Affecting: Approximately 10 homes affected
Project No.: 22-1395
Project Manager: Frank Pugliese
Telephone: (905) 867-6437

SCHEDULED WATER INTERRUPTION NOTICE – Tuesday, June 27, 2023 – 1179 Strathy Ave

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Tuesday, June 27, 2023, from 9:00 a.m. to 5:00 p.m.

Location:                    1179 Strathy Ave                            

Addresses Affected:  1166-1184 Strathy Ave, 1070-1095 Pelham Ave

Project #:                   C- 602891

Regional Inspector:  John Sedore

Telephone #               416-706-1114 Ext 3246/47

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Tuesday, June 27, 2023, from approximately 9:00 a.m. to 5:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

SCHEDULED WATER INTERRUPTION NOTICE – Tuesday, June 27, 2023 – 1393 Alexandra Ave   

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Tuesday, June 27, 2023, from 9:00 a.m. to 5:00 p.m.

Location:                    1393 Alexandra Ave                           

Addresses Affected:  1393-1442 Alexandra Ave, 920 Ninth St, 948-964 Eighth St

Project #:                   C- 603292

Regional Inspector:  John Sedore

Telephone #               416-706-1114 Ext 3246/47

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Tuesday, June 27, 2023, from approximately 9:00 a.m. to 5:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

SCHEDULED WATER INTERRUPTION NOTICE – Wednesday, June 28, 2023 – 69 Forest Ave 

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Wednesday, June 28, 2023, from 9:00 a.m. to 5:00 p.m.

Location:                    69 Forest Ave                             

Addresses Affected:  48-69 Forest Ave, 25 Cayuga Ave

Project #:                   C- 603249

Regional Inspector:  John Sedore

Telephone #               416-706-1114 Ext 3246/47

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday, June 28, 2023, from approximately 9:00 a.m. to 5:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

SCHEDULED WATER INTERRUPTION NOTICE – Wednesday, June 28, 2023 – 925 Goodwin Road 

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Wednesday, June 28, 2023, from 9:00 a.m. to 5:00 p.m.

Location:                    925 Goodwin Road                                

Addresses Affected:  908-945 Goodwin Road, 671-684

Project #:                   C- 602859

Regional Inspector:  John Sedore

Telephone #               416-706-1114 Ext 3246/47

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday, June 28, 2023, from approximately 9:00 a.m. to 5:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

EAB Removals – Starting June 22 for 2 weeks

By Resources, Ward 1

City contracted crews (Diamond Tree Service) will be working to remove Ash trees infested with Emerald Ash Borer (EAB) in Z06 (QEW down to Lakeshore and Cawthra to Dixie) , & Z07 (QEW down to the lake, and Hurontario to Cawthra and Aviation).

Crews will be practicing social distancing and appropriate signage will be posted.

Crews will be working Monday to Friday from 7 a.m. to 5 p.m. After the initial tree removal, crews will remove the tree stumps, repair the ground with topsoil and reseed. All works will be weather dependant.

All City-owned park trees removed due to EAB will be replanted over several years. This is due to the high number of trees removed from parks, the short planting season and weather conditions.

Forestry is currently working on plans to replant woodlots. Each woodlot is unique and will require additional work to create individual plans for each site. For some, that may mean letting them regenerate naturally while others will have trees replanted.

GO Service Changes

By Resources, Ward 1

Lakeshore West

Beginning Monday June 26, 2023

We’re adjusting schedules on the Lakeshore West line. 

  • The weekday westbound 10:43 p.m. trip from Union will depart four minutes later at 10:47 p.m.
  • The weekend eastbound 7:04 p.m. trip from Aldershot will depart three minutes earlier at 7:01 p.m.

We’re changing the length of some trains on the Lakeshore West line. 

  • On the Lakeshore West line, the 8:19 a.m. eastbound trip from Oakville will now be 12 cars long. This will make transferring from the express train to the local train easier by giving you more room on the platform.

 

SCHEDULED WATER INTERRUPTION NOTICE – Friday, June 23rd, 2023 – 298-380 Lakeshore Road W, 3-10 Benson Ave

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Friday, June 23rd, 2023, from 05:00 a.m. to 06:30 a.m.

Location:                    Lakeshore Road W and Benson Ave, Mississauga                       

Addresses Affected298-380 Lakeshore Road W, 3-10 Benson Ave

Project #:                   T-17004Ma

Regional Inspector:  John Sedore

Telephone #               905-791-7800 ext. 3246/3247

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on   Friday, June 23rd, 2023, from approximately    05:00 a.m. to 06:30 a.m.     If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

PROJECT UPDATE Watermain Replacement and Improvement Dundas Street East from Dixie Road to Etobicoke Creek

By Resources

The Region of Peel has been working in your area to replace the watermain on Dundas Street East from Dixie Road to Etobicoke Creek.
At this time, we have:
• Replaced portions of the watermain on Dundas Street East,
• Temporarily repaired the driveways, road, curbs, and sidewalk where disturbed by the watermain replacement work.

The remaining work will be completed under the next phase of the project. We will shutdown the work on site and clean up the week of June 19, 2023. We will leave the construction site in a safe condition for the next two months. Some pipes and other materials will remain on site until they are ready to be installed during the next construction phase.

Schedule for remaining construction and repair work
We expect to start work again in September 2023 to complete the following:
• Replace the remaining watermain on Dundas Street East,
• Construct a tunneled section of watermain under Little Etobicoke Creek,
• Connect properties to the new watermain by replacing individual water service pipes/boxes on Dundas Street East,
• Temporarily repair the driveways, road, curbs, sidewalks, and sod (grass), where disturbed by the watermain replacement work.
We plan to complete this work by the end of 2024.

More details about the remaining work will be shared in a follow-up notice.

City of Mississauga roadwork and bus rapid transit project
The Region of Peel remains committed to coordinating our work with the City of Mississauga’s roadwork and Dundas Bus Rapid Transit (BRT) project scheduled for 2025 on Dundas Street East (pending budget and council approval).

As this roadwork may impact the driveway, boulevard, street, curbs, and sidewalks, we will:
• Pave only the areas of the street directly disturbed,
• Fix damaged sidewalks and curbs using asphalt,
• Patch your driveway to cover any places we disturbed, as the future roadwork may affect the bottom of your driveway. After the city paves your street, the driveway will be repaired by paving a stripe over the disturbed area, resulting in minimal seams in the final driveway.

Peel Region’s repairs are temporary, as the city will complete restoration as part of their roadwork. Your city will send you a separate notice about their construction.

More information on the Dundas Bus Rapid Transit (BRT) project can be found by contacting the City of Mississauga or visiting mississauga.ca/projects-and-strategies/city-projects/building-the-dundas-bus-rapid-transit

Important note
This upcoming construction will take place in the municipal right-of-way, the land owned by your city located between the street and your water service box (small, round metal valve in either your driveway or lawn). This work may impact the bottom of your driveway and the area around the sidewalk. We therefore recommend delaying any driveway paving or major landscaping until after the Region of Peel and the city have completed all construction work.

Settlement of the ground
It is normal for repaired areas to settle a bit in the coming months. If you notice large potholes forming in the driveway, street, lawn or boulevard, please let us know and we will ensure the contractor fixes this.

Keeping you informed
We will let you know if there are any major changes to the plans.
Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup or scan the QR code below (using your cell phone camera) to start signing up.

Information on this project can also be found at peelregion.ca/pw/construction/miss/18-1310C.asp

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water. If you have any questions, please contact us.

Water Linear Engineering and Reliability
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409