Category

Ward 1

ADVANCE NOTICE Watermain Improvement East Avenue and Rangeview Road

By Resources, Ward 1

Peel Region is planning to install new watermains in your area within the next two years, as shown on the attached map. Watermains are underground pipes that bring tap water from our water treatment plants to your neighbourhood. As our population grows, we need to build larger watermains to keep providing high quality water services.

Important note
This upcoming construction will take place in the municipal right-of-way and within permanent easements.
• The municipal right-of way includes the street and the land owned by your city between the street and your water service box (small, round metal valve in either your driveway or lawn).
• An easement is where Peel Region has obtained legal access to enter your property for the purposes of maintaining and improving Regional infrastructure.

This work may impact the bottom of your driveway and the area around the sidewalk. We therefore recommend delaying any major landscaping or driveway paving until after this construction has been completed.

Before construction begins
Before we start construction, you may notice several activities in your area:
1. We will survey your street and use temporary spray paint or flags to mark the location of underground gas, hydro, and cable on roads, driveways, and lawns.
2. We may drill holes in the road or municipal right-of-way (the land between the street and your water service box) to collect soil samples, determine ground conditions, or confirm utility locations.
3. We will take pictures and record video to help us restore the area as close as possible to its former condition, after construction takes place.
We expect these activities to take place between May 2024 and December 2024.

Keeping you informed
We are currently in the early planning stages, so we can’t give exact dates for when we will do the work.
In addition, as your city’s future planning activities may change, we may alter our plans to improve watermains in your neighbourhood. We will deliver more detailed information to your home or business closer to the proposed construction date.

Sign up for email notices
Receive timely updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup to start signing up.

Information on this project can also be found at peelregion.ca/construction/project-22-1125/

If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

ADVANCE NOTICE Sanitary Sewer Replacement and Improvement Mattawa Avenue

By Resources, Ward 1

Peel Region is planning to replace the sanitary sewers in your area within the next two years, as shown on the attached map. Sanitary sewers are underground pipes that carry wastewater from your home to a wastewater treatment plant. Wastewater is created when water goes down the drain or is flushed down the toilet. As pipes age and our population grows, we need to replace older watermains and sewers to keep providing high quality wastewater services to you.

Important note
This upcoming construction will take place in the municipal right-of-way. The municipal right-of way includes the street and the land owned by your city between the street and your water service box (small, round metal valve in either your driveway or lawn). This work may impact the bottom of your driveway and the area around the sidewalk. We therefore recommend delaying any major landscaping or driveway paving until after this construction has been completed.

Before construction begins
Before we start construction, you may notice several activities in your area:
1. We will survey your street and use temporary spray paint or flags to mark the location of underground gas, hydro, and cable on roads, driveways, and lawns.
2. We may drill holes in the road or municipal right-of-way (the land between the street and your water service box) to collect soil samples, determine ground conditions, or confirm utility locations.
3. We will take pictures and record video to help us restore the area as close as possible to its former condition, after construction takes place.
We expect these activities to take place in Summer 2024.

Keeping you informed
We are currently in the early planning stages, so we can’t give exact dates for when we will do the work.
In addition, as your city’s future planning activities may change, we may alter our plans to replace watermains or sanitary sewers in your neighbourhood. We will deliver more detailed information to your home or business closer to the proposed construction date.

Sign up for email notices
Receive timely updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup to start signing up.

Information on this project can also be found at peelregion.ca/pw/construction/miss/24-2300A3

If you have any questions, please contact us.

Water Linear Engineering & Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

ADVANCE NOTICE – Sanitary Sewer and Watermain Replacement and Improvement – Baldwin Road, Wyton Court, Stanfield Road, Third Street, West Avenue

By Resources, Ward 1

Peel Region is planning to replace the watermain and sanitary sewers in your area within the next two years, as shown on the attached map.
• Watermains are underground pipes that bring tap water from our water treatment plants to your neighbourhood.
• Sanitary sewers are underground pipes that carry wastewater from your home to a wastewater treatment plant. Wastewater is created when water goes down the drain or is flushed down the toilet.
As pipes age and our population grows, we need to replace older watermains and sewers to keep providing high
quality water and wastewater services to you.

Important note
This upcoming construction will take place in the municipal right-of-way. The municipal right-of way includes the street and the land owned by your city between the street and your water service box (small, round metal valve in either your driveway or lawn). This work may impact the bottom of your driveway and the area around the sidewalk. We therefore recommend delaying any major landscaping or driveway paving until after this construction has been completed.

Before construction begins
Before we start construction, you may notice several activities in your area:
1. We will survey your street and use temporary spray paint or flags to mark the location of underground gas, hydro, and cable on roads, driveways, and lawns.
2. We may drill holes in the road or municipal right-of-way (the land between the street and your water service box) to collect soil samples, determine ground conditions, or confirm utility locations.
3. We will take pictures and record video to help us restore the area as close as possible to its former condition, after construction takes place.
We expect these activities to take place in Summer 2024.

Keeping you informed
We are currently in the early planning stages, so we can’t give exact dates for when we will do the work.
In addition, as your city’s future planning activities may change, we may alter our plans to replace watermains or sanitary sewers in your neighbourhood. We will deliver more detailed information to your home or business closer to the proposed construction date.

Sign up for email notices
Receive timely updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup to start signing up.

Information on this project can also be found at peelregion.ca/pw/construction/miss/24-2300A2

If you have any questions, please contact us.

Water Linear Engineering & Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

SCHEDULED WATER INTERRUPTION NOTICE – Thursday, May 16th, 9:00 am to 5:00pm – 1311 Northaven Dr

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time: Thursday, May 16th, 9:00 am to 5:00pm

Location: 1311 Northaven Dr                              

Addresses Affected: 1258-1316 Northaven Dr                           

Project #: C603083

Regional Inspector: Phemelo Mpoloka

Telephone #               437-220-8917

905-791-7800 ext. 3246/3247

SCHEDULED WATER INTERRUPTION NOTICE

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Thursday, May 16th from approximately 9:00am to 5:00 pmIf we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

Bus Stop Impact – Cawthra Road (Stop #0764)

By Resources, Ward 1

Please be advised, Cawthra Road stop #0746 scheduled stop impact has been adjusted and will be out of service from Saturday May 25 to Sunday May 26th for construction work.

Patrons will be directed to the previous stop #0763 at Tedwyn Drive (NW Corner) which is approximately 225 metres north.

Stop #0764 is serviced by Route 8 South with continued accessible bus service at stop #0763.

THE RETURN OF THE LAKEVIEW FARMERS AND ARTISAN MARKET

By Events, Ward 1

The eagerly awaited return of the Lakeview Farmers and Artisan Market is set to return for its fifth season at Mississauga’s Small Arms Inspection Building on May 26th, 2024, from 9:00 am to 2:00 pm. Held weekly on Sundays from May 26th to October 27th, the Market features local, sustainable, organic, and artisanal products, which provide an important source of income for local farmers, growers, producers, and artisans.

Throughout its 26-week run, the Market will feature more than 30 local farmers and food vendors, as well as a bi-weekly artisan market with an additional 60 rotating vendors. Whether visitors are seeking farm-fresh produce, artisanal crafts, gourmet treats, or unique handmade goods, there will be something for everyone at the Market.

The Market operates hybridly indoors and outdoors, with local buskers, entertainment, a cafe, and much more. Throughout the season, the Market will also be home to exciting activities such as a Garlic Festival, Vintage Clothing Market, Multicultural Festival, and many more, where additional vendors, games, and workshops will be available for attendees to enjoy.

“We’re thrilled to welcome back the Lakeview Farmers and Artisan Market, a cherished gathering place for our community,” said Meredith Wood, Executive Director. “This season, we’re excited to introduce new vendors alongside our returning favorites, highlighting the diverse talents and flavors of Mississauga.”

The Market’s success is made possible by the unwavering support of various partners.

“We extend our heartfelt gratitude to the City of Mississauga, McKenna Logistics, InSauga, Modern Mississauga Media, Curbex Media, and all our partners for their invaluable support,” added Meredith Wood. “Together, we’re creating a platform that celebrates the rich tapestry of our community while providing a supportive environment for local farmers and artisans to thrive.”

The Lakeview Farmers’ and Artisan Market is operated by CreativeHub 1352, a non-profit, charitable, community-driven organization which exists for the advancement of community cultural development through the arts, heritage, and environmental sciences. One of the many groups vital to the reuse of the Small Arms Inspection Building, all proceeds from the market will be reinvested into the market to support local farmers, producers, artisans and education.

For more information, including a schedule of upcoming themes and activations, visit https://www.creativehub1352.ca/lakeviewfarmersmarket

Invasive Species Stewardship Event

By Events, Parks, Resources, Ward 1

Please be aware of  two upcoming invasive species stewardship events in Ward 1 this Spring.

 

Event Location: Adamson Estate Park

Event Date and Time: Saturday, June 15, 2024 from 10:00am to 12:00pm

Activity: Removing invasive Garlic Mustard

Participants can register here: Event link

 

Event Location: Cawthra Woods

Event Date and Time: Wednesday June 26, 2024 from 6:30pm to 8:30pm

Activity: Removing invasive groundcover plants

Participants can register here: Event link

 

These events support the City’s Invasive Species Management Plan and Implementation Strategy, which aims to reduce the abundance of Invasive Species in Mississauga’s natural areas and collaborate with Mississauga residents to increase the success of invasive species projects.

Bus Stop Impact – Dundas Street East (Stops #1191 and #0864)

By Resources, Ward 1

Please be advised that stop #1191 on EB Dundas Street East at Jarrow Avenue will be back in service effective 8:00am Wednesday May 8.

Also, please be advised that the next stop #0864 on EB Dundas Street East at Mattawa Avenue will be out of service effective 8:00am Wednesday May 8 until further notice for construction tunnelling works.

Patrons will be directed to stop #1191 at Jarrow Avenue which is approximately 240 metres west.

Stop #0864 is serviced by Route 1/1C East with continued accessible bus service at Stop #1191.

Upcoming Construction at Hurontario and Mineola – May 4th 7:00 to 10:00 p.m

By Hurontario LRT, Resources, Ward 1

There is currently emergency works scheduled at the intersection of Mineola and Hurontario this Saturday, May 4 from 7:00 am to 10:00 pm.

This work has been necessitated because during the testing of sanitary pipes it was discovered that an older pipe was collapsing.

This work is occurring at the direction of the City of Mississauga and the Region of Peel.

During this work east bound traffic on Mineola will not able to make a left turn. Electronic signs will be installed to inform the motorists.

The construction notice is posted below and has been hand delivered to businesses and residents in the surrounding area.