Resources

TEMPORARY ROAD CLOSURE MISSISSAUGA ROAD BETWEEN SOUTH SHERIDAN WAY AND THE WESTBOUND MISSISSAUGA ROAD OFF-RAMP FROM THE QEW – Thursday, October 26th and Friday, October 27th from 10pm until 5am

By Resources

As part of the QEW/Credit River improvement project, a temporary road closure of Mississauga Road between South Sheridan Way and the westbound Mississauga Road off-ramp from the QEW is required to be closed in order to place girders for the remaining part of the QEW.

When:   Thursday, October 26th and Friday, October 27th from 10pm until 5am (overnight only, road will reopen during the day).

Where:  Mississauga Road between South Sheridan Way and the westbound Mississauga Road off-ramp from the QEW.

Why:     In order to implement girders for the QEW Mississauga Road overpass.

Advance warning signs and detour signs are in place. An access to Mississauga Crescent from the north side will be maintained however, no access will be maintained for emergency service under the overpass.

Notice of Bus Stop Impact: #0709 – NB Hurontario St at South Service Rd | Monday, October 23, 2023

By Hurontario LRT, Resources, Ward 1

Please be advised of the following stop impacts. See the related details below:

Stop(s) Impacted:  No. 0709: NB Hurontario St at South Service Rd

Temporary Stop Location:

0332 – NB Hurontario St at Pinewood Trail (340m south)

0728 – NB Hurontario St at North Service Rd (500m north)

Routes Impacted: 2 North

Date and Time: Monday, October 23, 2023 @ 7:00am

Estimated Duration: until Thursday, October 26, 2023 @ 7:00am

Event Type: HuLRT

Agency: Mobilinx

Notes:

–             Stops will remain accessible;

–             No detours required.

Notice of Bus Stop Impact: #0330 – NB Hurontario St at Hampshire Cres | Monday, October 23, 2023

By Hurontario LRT, Resources, Ward 1

Please be advised of the following stop impacts. See the related details below:

Stop(s) Impacted:  No. 0330: NB Hurontario St at Hampshire Cres

Temporary Stop Location:

0332 – NB Hurontario St at Pinewood Trail (110m south)

Routes Impacted: 2 North

Date and Time: Monday, October 23, 2023 @ 7:00am

Estimated Duration: until Thursday, October 26, 2023 @ 7:00am

Event Type: HuLRT

Agency: Mobilinx

Notes:

–             Stops will remain accessible;

–             No detours required.

Notice of Bus Stop Impact: #0331 – SB Hurontario St at Indian Valley Trail | Tuesday, October 17, 2023

By Hurontario LRT, Resources, Ward 1

Please be advised of the following stop impacts. See the related details below:

Stop(s) Impacted:  No. 0331: SB Hurontario St at Indian Valley Trail

Temporary Stop Location:

0305 – Hurontario St south of Indian Valley Trail (195m south)

0329 – Hurontario St at Pinetree Way (315m north)

Routes Impacted: 2 South

Date and Time: Effective Immediately

Estimated Duration: until Thursday, October 19, 2023 @ 5:00pm

Event Type: HuLRT

Agency: Mobilinx

Notes:

–             Stops will remain accessible;

–             No detours required.

 

Construction Notice – MAINTENANCE UPDATE Watermain Improvement Primate Road & Dixie Road Intersection – Monday, October 23, 2023, to Friday, October 27, 2023, from 7:00 pm. till 7:00 am.

By Resources, Ward 1

Peel Region will be doing maintenance work in your area on Primate Road at Dixie Road.
Some upcoming work will take place overnight, to drain, repair, and modify an existing watermain in the chamber.
This overnight work will occur at the Primate Road and Dixie Road intersection. We apologize in advance for any
inconveniences caused by this work.

Schedule
The City of Mississauga, under the Noise Bylaw, is allowing work to be done by our contractor overnight. This
overnight work is expected to take place for multiple evenings, from Monday, October 23, 2023, to Friday,
October 27, 2023, from 7:00 pm. till 7:00 am. Additional nights may be required due to unpredictable delays, such
as poor weather conditions.

Traffic impacts
Primate Road will be reduced to a single shared lane just west of Dixie Road. Where a single lane is shared with
oncoming traffic, please be sure to yield to oncoming traffic as stated by the road signs. These lanes will be
reopened from 7:00 a.m. to 7:00 p.m. daily.

Noise
We do not anticipate significant noise or vibrations above normal daytime construction levels during these
operations. Efforts will be made to reduce impacts to residents as much as possible.

Safety during construction
Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction
workers. When driving, walking, or biking through the construction area, please be aware of your surroundings,
watch for construction crews and other road users, slow down, account for delays, and consider other routes if
possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing
you with high quality tap water. If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

 

Open House – Arthur P. Kennedy Water Treatment Plant

By Events, Resources, Ward 1

Peel Region invites the community to get a behind the scenes look at how their tap water is treated and cleaned at the Arthur. P. Kennedy Water Treatment Plant.

Event details

Date: Saturday, October 21, 2023
Time: 10 a.m. to 4 p.m. (free drop in, last tour at 3:30 p.m.)
Location: 920 East Avenue, Mississauga
Parking available

The open house showcases how the state-of-the art plant treats and distributes 570 million litres of safe, quality drinking water to Peel homes, schools, and workplaces each day.

The event is being held in recognition of Imagine a Day Without Water an international day that raises awareness about the value of water as an essential resource.

“We are proud to provide these vital services that touch the community every day. In a world where many don’t have has access to clean, safe drinking water and are impacted by climate change we will continue to protect this valuable resource and deliver clean water for life.”  Jeff Hennings, Director Water and Wastewater Engineering Services, Peel Region

About Peel Region
Peel Region works with residents and partners to create a healthy, safe, and connected Community for Life for approximately 1.5 million people and over 175,000 businesses in Brampton, Mississauga, and Caledon. Peel’s services touch the lives of residents every day. Learn more about Peel’s continuing commitment to our community during our transition. For more information explore peelregion.ca and follow us on Twitter @regionofpeel and Instagram @peelregion.ca.

 

 

Notice of Bus Stop Impact: #0334 – NB Hurontario St at Mineola Rd E | Monday, October 16, 2023

By Hurontario LRT, Resources, Ward 1

Please be advised of the following stop impacts. See the related details below:

Stop(s) Impacted:  No. 0334: NB Hurontario St at Mineola Rd E

Temporary Stop Location: Relocated 100m south

Routes Impacted: 2 North, 8 North

Date and Time: Monday, October 16, 2023 @ 7:00am

Estimated Duration: until Thursday, November 2, 2023 @ 7:00am.

Event Type: HuLRT

Agency: Mobilinx

Notes:

–             Stops will remain accessible;

–             No detours required.

SCHEDULED WATER INTERRUPTION NOTICE – Lakeshore Rd W & Benson Ave (Port Credit West Village) – from Thursday, October 12th, 11:00 pm to Friday, October 13th, 5:00 am 

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time: from Thursday, October 12th, 11:00 pm to Friday, October 13th, 5:00 am 

Location: Lakeshore Rd W & Benson Ave (Port Credit West Village)                                 

Addresses Affected: 296-380 Lakeshore Road W, 3-10 Benson Ave; 153 high St W; 5-14 Pine Ave N                                 

Project #: T-17004Ma

Regional Inspector:  John Sedore

Telephone #   416-706-1114 ext. 3246/3247

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on from Thursday, October 12th, 11:00 pm to Friday, October 13th, 5:00 am. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)