Resources

Construction Notice – Northbound Lane Restriction and 24-Hour Works at Park Street and Hurontario Street – Thursday October 19 at 10 p.m. to Monday October 23 at 10 p.m.

By Hurontario LRT, Resources, Ward 1

What work is taking place?

Construction crews will be installing a new manhole and storm infrastructure at Park Street and proceed north. This will result in the temporary partial closure of Park Street at Hurontario Street from October 19 to 23, 2023. The work will be continuous throughout this duration. The partial closure will involve a further lane reduction on Hurontario Street where only southbound traffic will be permitted through from Eaglewood Avenue to the Park Street intersection while the storm works are under construction.

During this closure, northbound traffic on Hurontario Street will be restricted at High Street. Two northbound detours are shown on the map. Access to emergency vehicles will be maintained for southbound traffic on Hurontario Street and a paid duty police officer will be present to control traffic at the intersection during construction hours.

Northbound transit service will be impacted for both MiWay and GO Transit. Please see below for detour information and visit www.miway.ca/updates and www.gotransit.com/service-updates for the latest information.

In accordance with City of Mississauga Noise By-Law Exemption requirements, this notice is meant to advise that residents near the work site can expect to hear noise and vibration caused by trucks, excavators, backhoes, and other construction equipment related to this work, so crews will be able to complete this work safely and efficiently.

Please note, work may be rescheduled due to weather or unforeseen circumstances. If you require the most up-to-date information, please reach out to peel@metrolinx.com.

TIMING
• Park Street West will be closed from 10 p.m. on October 19 to 10 p.m. on October 23, 2023.
• Work could be rescheduled and delayed due to weather conditions or unforeseen circumstances.

TRAFFIC DETAILS
• Southbound traffic will be permitted along Hurontario Street through the intersection at Park Street
• Northbound traffic on Hurontario Street will be restricted at High Street, but maintained through two detours:
1) Lakeshore Road, Cawthra Road and QEW
2) Lakeshore Road, Mississauga Road and QEW.
• Access for emergency vehicles travelling southbound on Hurontario Street will be maintained.
• Watch for slow moving vehicles entering and exiting work areas.
• Remember to reduce your speed when approaching work zones.

WHAT TO EXPECT?
• Every effort will be made to minimize disruptions.
• Residents and businesses near the work site can expect to hear noise and vibration caused by trucks, excavators, loaders, triaxles, backhoes, and other construction equipment related to this work.

TRANSIT IMPACT DETAILS
• MiWay Route 2N will detour via Lakeshore Road, Cawthra Road, Atwater Avenue/Mineola Road East. Access to MiWay stops along Atwater Avenue and Mineola Road East will be available using Route 2N.
• MiWay Route 8N and GO Bus Route 21C will detour via Lakeshore Road and Cawthra Road. MiWay Route 8N will resume its normal route at Atwater Avenue
• Visit www.miway.ca/updates and www.gotransit.com/service-updates for updates to any route changes.

PEDESTRIAN DETAILS
• Please take care when travelling near construction areas.
• Watch for additional signs directing pedestrians as detours may be required.
• Clear and defined walking paths will be maintained during construction to ensure pedestrian safety.

CONTACT US
• Metrolinx has a dedicated community relations team in place to work with residents in Peel region through the construction and operation of this transformational transit project.
• 24-hour line 416-202-7500.

Notice of Bus Stop Impact: #0330 – NB Hurontario St at Hampshire Cres | Tuesday, October 10, 2023

By Hurontario LRT, Resources, Ward 1

Please be advised of the following stop impacts. See the related details below:

Stop(s) Impacted:  No. 0330: NB Hurontario St at Hampshire Cres

Temporary Stop Location:

0332 – NB Hurontario St at Pinewood Trail (110m south)

Routes Impacted: 2 North

Date and Time: Tuesday, October 10, 2023 @ 7:00am

Estimated Duration: until Thursday, October 19, 2023 @ 5:00 pm

Event Type: HuLRT

Agency: Mobilinx

Notes:

–             Stops will remain accessible;

–             No detours required.

Notice of Bus Stop Impact: #0709 – NB Hurontario St at South Service Rd | Tuesday, October 10, 2023

By Hurontario LRT, Resources, Ward 1

Please be advised of the following stop impacts. See the related details below:

Stop(s) Impacted:  No. 0709: NB Hurontario St at South Service Rd

Temporary Stop Location:

0332 – NB Hurontario St at Pinewood Trail (340m south)

0728 – NB Hurontario St at North Service Rd (500m north)

Routes Impacted: 2 North

Date and Time: Tuesday, October 10, 2023 @ 7:00am

Estimated Duration: until Thursday, October 19, 2023 @ 5:00 pm

Event Type: HuLRT

Agency: Mobilinx

Notes:

–             Stops will remain accessible;

–             No detours required.

Budget Committee Approves Fees and Charges Schedule for 2024

By Resources

The City of Mississauga’s Budget Committee has approved the 2024 schedule for fees and charges, including the City’s Stormwater charge, which was recently revised. The City charges user fees for various services like transit, room and ice rentals, as well as recreation and culture programs. Fees and charges help to recover costs for services or activities that the City provides.

“User fees and charges play an important role in helping the City generate revenue to offset costs in other areas,” said Marisa Chiu, Director, Finance and Treasurer. “While most services are covered through the collection of property taxes, user fees and charges are charged to those who benefit directly from a program or service. Price recommendations are based on cost recovery, participation rates, the availability of affordable offerings, service sustainability, customer feedback and market conditions.”

2024 schedule for fees and charges

All fees and charges are reviewed by staff during the annual budget process. The City completed an internal review and evaluated its fees and charges for 2024. Several corporate reports on the proposed changes were received and approved by the Budget Committee yesterday. Some of the proposed fees and changes include:

Transit – fare changes (effective April 1, 2024)

  • $3.20 to $3.40 for PRESTO single Adult fare
  • $131 to $141 for Adult monthly pass
  • $2.45 to $2.65 for PRESTO single Youth fare
  • $4 to $4.25 for Adult and Youth cash fare

Recreation program fees & rental rates

  • NEW: Room rentals fee per sq.ft. for dedicated/shared storage
  • NEW: Recording studio and kitchen fee per hour
  • NEW: Paramount Fine Foods Centre event fees for affiliated groups per day

Parks, Forestry and Environment fees

  • NEW: Natural heritage processing fee
  • NEW: Tree protection zone signage fee

General fees and charges

  • NEW: EDO IDEA Square One Innovation Hub fee

Chiu added, “The recommendations to change fees and charges are based on factors like market conditions, demand for service, cost of delivery, and inflation. Price increases are recommended for programs and lines of business that can absorb the increase without negatively affecting participation or revenue.”

The Fees and Charges By-law, approved by Council, identifies the rates and fees proposed for specific City services, programs and activities. The 2024 Fees and Charges schedule is set to be implemented as of January 1, 2024 (with some exceptions to align with business areas).

Final approval for all fees and charges will be made at Council on Wednesday, October 11, 2023.

Budget Committee meetings

The next Budget Committee meeting is scheduled for Monday, November 27, 2023, at 9:30 a.m., and is open for the public to attend. The full schedule of meetings is available online at Council and Committees Calendar Listings.

Stay informed

Learn more about the City’s 2024 Budget and Business Plan by and the important role they play in our City by:

  • Attending in person or watching a Budget Committee meeting via live stream.
  • Signing up for a 2024 Budget Information Session on Tuesday, November 28, 2023
  • Emailing a question or comment to budget@mississauga.ca or calling 311
  • Following the City budget conversations and posts on Facebook and X (formally Twitter)
  • Reading the proposed Budget Book (being released publicly on November 6, 2023)
  • Watching the Budget Basics video

For more information about the City’s budget, visiting mississauga.ca/budget.

Reduce, Upcycle and Repurpose: Celebrate Circular Economy Month and Waste Reduction Week

By Events, Resources

Did you know that almost 50 per cent of garbage sent to landfill can be reused, repurposed or upcycled? October is Circular Economy Month. In a circular economy model, nothing is wasted. Products and materials are reused, repaired, refurbished, repurposed or recycled. This can include items like clothing with rips, electronics that can be repaired or glass jars that can be recycled or reused for storing items or are great as flower vases.

Residential waste is diverted from landfills through recycling, green bin, yard waste and other diversion initiatives. However, we all need to work together to reduce, upcycle and repurpose items to further help divert waste from landfill, help conserve energy and reduce carbon emissions in Mississauga.

In addition to Circular Economy Month, the City is also celebrating Waste Reduction Week. From October 10 to 22, join us at various events to practise waste reduction by donating clothing or by learning to sew at a Makerspace.

Event details:

What:

Donate to the recycling collection drive

The City is again participating in the Toronto and Region Conservation Authority’s Partners in Project Green’s collection drive for clothing, textiles and electronics. From October 10 to 22, you can drop off unwanted clothing, textiles and electronics in bins located at various City facilities.

You can donate things like hats, bags, belts, ties, footwear, bedding, pillows, linens, curtains and sleeping bags. Electronics will be collected in a separate bin and accepted items include laptops, computers, printers, keyboards, mice, and handheld devices. All clothing items will be donated to Diabetes Canada and all electronics will be recycled by Electronic Recycling Association.

Drop-off locations include:

Learn to sew at a Makerspace

Looking to learn how to repair your clothes? Using one of the Library’s handicraft programs at Burnhamthorpe LibraryCourtneypark LibraryMeadowvale Library and Woodlands Library, you can learn how to sew by hand or with a sewing machine to avoid purchasing new products.

Who:

All Mississauga residents interested in learning more about repurposing, upcycling and waste reduction.

When:

Events take place throughout October.

Where:

All events are in-person at various locations in Mississauga.

Register to be a Repair Hub volunteer

Have experience in repairing bikes, household items, appliances, jewellery, electronics or clothing?

The City is looking for volunteers to help repair broken items as a way to extend the life of products. Learn more about this opportunity to give back to the community and bring awareness to waste reduction and the circular economy. Apply now.

Other ways to reduce waste at home

Extend the life of items like clothing, appliances and electronics by repairing them when possible.

  • Fruit and vegetable scraps, eggshells, coffee grounds and napkins can all be composted. Place these items in your Peel Region green bin for curbside collection or in your backyard composter.
  • Remember to bring your reusable bags for shopping and reusable bottles and mugs for drinks.
  • Consider borrowing or renting less frequently used items like tools, party supplies and board games. In addition to borrowing books, the City’s libraries offer movies, video games and sewing machines
  • Prioritize reusing, recycling or donating furniture, household items, office supplies and other materials to reduce carbon emissions and save expenses.

Learn more about how Mississauga is leading climate change efforts and other environmental sustainability initiatives through the Climate Change Action Plan.

October GO Service Changes – Lakeshore West

By Announcement, Resources, Ward 1

Starting Tuesday October 17, 2023: 

For Peel customers at our Mississauga stations, certain trips may depart up to two minutes earlier or up to five minutes later than their previous schedule. Please check your schedules before you travel.

Importantly, these adjustments will not affect the frequency of service you have come to rely on.

As you travel, we recommend listening closely to announcements on your train for specific directions. There might be instances where you’ll need to switch platforms at Union Station to continue your journey.

Customers are encouraged to visit Triplinx.ca to plan their trip and understand their travel options.

SCHEDULED WATER INTERRUPTION NOTICE – Lakeshore Rd W & Benson Ave (Brightwater) – Tuesday, October 10th, from 1:00 am to 4:00 am

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time: Tuesday, October 10th, from 1:00 am to 4:00 am

Location: Lakeshore Rd W & Benson Ave (Brightwater)                               

Addresses Affected:  298-380 Lakeshore Road W, 3-10 Benson Ave (North side of Lakeshore Road W)                                  

Project #: T-17004Ma

Regional Inspector:  John Sedore

Telephone #   416-706-1114 ext. 3246/3247

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Tuesday, October 10th from approximately 1:00am to 4:00 am.     If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

UPDATE – SCHEDULED WATER INTERRUPTION NOTICE – Lakeshore Rd W & Benson Ave (Brightwater) – from Sunday, October 8th, 11:00 pm to Monday, October 9th, 5:00 am

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time: from Sunday, October 8th, 11:00 pm to Monday, October 9th, 4:00 am

Location: Lakeshore Rd W & Benson Ave (Brightwater)                                   

Addresses Affected:  296-380 Lakeshore Road W, 3-10 Benson Ave; 153 high St W; 5-14 Pine Ave N                                    

Project #: T-17004Ma

Regional Inspector:  John Sedore

Telephone #   416-706-1114 ext. 3246/3247

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on from Sunday, October 8th, 11:00 pm to Monday, October 9th, 4:00 am. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

Traffic impacts: watermain replacement temporarily closes South Sheridan Way from Southdown Road to Indian Road in Mississauga

By Resources

Peel Region will be temporary closing South Sheridan Way from Southdown Road to Indian Road starting the week of October 2, 2023, to replace a watermain.

As a major east-west arterial road in Mississauga, the road closure will increase travel times. Motorists should consider alternate routes.

The replacement is expected to be completed into the winter 2024. Average construction noise is expected. There will be no impact to drinking water for the community.

Follow @peelpublicworks for information and updates.