In preparation for the construction of the Hurontario LRT, the constructor must close Pinewood Trail just east of Hurontario Street to install an electrical duct bank.
During the closure, no vehicles (including Emergency Services) will be able to access Pinewood Trail from Hurontario Street. A signed detour will be erected that uses Mineola Road East and Goldthorpe Road to access Pinewood Trail.
Variable Message Signs will been installed to advise motorists of the planned closure and a copy of the notification letter that was hand delivered to residents in the area is attached.
The road closure will take place:
- Tuesday August 16th, 2022 at 7 am through to Saturday August 20th at 5:00 pm. Work will be occurring 24 hours a day.
NOTE: Construction schedules are subject to change due to weather conditions and unforeseen construction conditions. Should the schedule require changes for any reason, an updated notice will be circulated.
What work is taking place?
Construction crews will be installing utilities along Hurontario Street that will also need to cross Pinewood Trail. This will result in a temporary closure of a portion Pinewood Trail from 7 a.m on August 16 to 5 p.m. on August 20, 2022. The road closure and construction will be continuous throughout this duration.
In accordance with City of Mississauga Noise By-Law Exemption requirements, this notice is meant to advise that residents near the work site can expect to hear noise and vibration caused by trucks, excavators, backhoes, and other construction equipment related to this work. Some of this work will be done overnight and, on the weekend, so crews will be able to complete this work safely and efficiently.
During this closure, motorists can access Pinewood Trail from Hurontario Street using the detour map provided. Please note, work may be rescheduled due to weather or unforeseen circumstances. If you require the most up-to-date information, please reach out to peel@metrolinx.com.
TIMING
Pinewood Trail will be closed from: o 7 a.m. August 16 to 5 p.m. August 20, 2022 o The road closure and construction work will be continuous throughout this duration
Work could be rescheduled and delayed due to weather conditions or unforeseen circumstances.
TRAFFIC DETAILS
Access to Pinewood Trail will be maintained through a detour from Hurontario Street, Mineola Road East and Goldthorpe Road.
Watch for slow moving vehicles entering and exiting work areas.
Remember to reduce your speed when approaching work zones.
WHAT TO EXPECT?
Every effort will be made to minimize disruptions.
Residents and businesses near the work site can expect to hear noise and vibration caused by trucks, excavators, loaders, triaxles, backhoes, and other construction equipment related to this work.
TRANSIT DETAILS
MiWay near the intersection will continue to operate with regular service.
Visit www.miway.ca/updates for updates.
Watch for additional signs directing passengers at bus stop as boarding areas may be relocated.
PEDESTRIAN DETAILS
Please take care when travelling near construction areas.
Watch for additional signs directing pedestrians as detours may be required.
Clear and defined walking paths will be maintained during construction to ensure pedestrian safety
CONTACT US
Metrolinx has a dedicated community relations team in place to work with residents in Peel region through the construction and operation of this transformational transit project.
24-hour line 416-202-7500.
Stop(s) Impacted: No.: 0333: SB Hurontario St at Mineola Rd W
Temporary Stop Location: Temporary marker to be placed 20m to the South
Routes Impacted: 2 South
Date and Time: Effective Immediately
Estimated Duration: until Friday, August 26, 2022 @ 5:00pm
Event Type: HuLRT
Agency: Mobilinx
Notes:
– Stops will remain accessible;
– No detours required.
Please be advised that the above will be filming interior scenes for a “Natalist” commercial at 1649 Sunnycove Dr (Ward 1) on August 12th, 7:00 AM – 11:00 PM. Any prep and wrap activity will be entirely on private property.
A permit has been granted to allow parking on the following:
- One side of Sunnycove Dr between Laughton Ave and Tarn Rd
August 10, 2022
A Region of Peel delegation consisting of the Regional Chair and members of Regional Council will be attending the 2022 Association of Municipalities of Ontario (AMO) conference, August 14-17 in Ottawa. The Region participates annually in this AMO’s premier event, which provides Ontario municipalities with a forum for conversation with provincial decision-makers regarding ongoing challenges and with opportunities for collaboration and learning through numerous workshops and information sessions. Read More
Please be advised of the following stop impacts. See the related details below:
Stop(s) Impacted: No.: 0334: NB Hurontario St at Mineola Rd
Temporary Stop Location: Existing temporary platform to be relocated 125m to the South
Routes Impacted: 2 North, 8 North
Date and Time: Effective Immediately
Estimated Duration: until Tuesday, September 6, 2022 @ 5:00pm
Event Type: HuLRT
Agency: Mobilinx
Notes:
– Stops will remain accessible;
– No detours required.
Dear Customer:
The Ministry of Transportation is undertaking a highway widening project along Queen Elizabeth Way from Evans Ave to Cawthra Road. Please refer to the key map attached to the back of this letter. This project requires Alectra Utilities to relocate poles and underground cables to accommodate this work. Alectra Utilities will be performing the following construction work: Read More
Please be advised that the above will be filming interior and exterior scenes for a TV Series “Accused” at 2365 Dixie Rd (Ward 1) on August 2nd, 7:00 AM – 11:00 PM. Prep will be conducted on July 28th – August 1st, 7am-6pm and wrap on August 3rd, 7am-7pm.
A permit has been granted to allow parking on the following:
- North side of Caterpillar Rd only
Production has been approved for intermittent traffic stoppages (max of 3 min) under the supervision of Peel Regional Police not between the hours of 7am – 9am and 4pm – 6pm, as they film a vehicle pulling into their studio property from Caterpillar Rd.