MEDIA RELEASE: More families in Peel to benefit from affordable child care

By Resources

More families in Peel to benefit from affordable child care

BRAMPTON, Ont. – July 15, 2025.

The Canada-wide Early Learning and Child Care (CWELCC) plan, also known as $10 a day child care, has already significantly increased the demand for child care in Peel. To address this, Peel’s Early Years and Child Care Services (EYCCS) Division asked the Ministry of Education to allocate more child care spaces, provide capital funding, and allow flexibility to approve more commercial child care spaces to deliver much needed service in the community.

Peel’s advocacy efforts were successful and in March 2025, Peel was granted:

  • 1,672 additional licensed child care spaces to be created by the end of 2026. This means that a total of 13,652 new affordable spaces will be created in Peel between 2022 and 2026.
  • Greater flexibility to approve more commercial spaces which allows EYCCS to respond more quickly to child care providers who are ready to expand.
  • An additional $29.8 million to implement these changes, including $11.8 million for an Early Learning and Child Care Infrastructure Fund to support non-profit child care expansion.

These welcome changes mean that more families with children younger than six years will have access to high-quality, affordable child care. What’s more, many of those families who will benefit are in underserved communities.

EYCCS staff continue to monitor and put in place strategies to address any challenges that could limit the successful implementation of the CWELCC program.  Challenges include hiring and retaining qualified staff in child care programs, increasing lease costs in community-based child care settings and very short timelines for rolling out the Early Learning and Child Care Infrastructure Fund.

Important Update – Upcoming NAV CANADA Flight Checks: Second Semi-annual Test

By Food for thought

NAV Canada regularly conducts instrument landing system (ILS) check at Toronto Pearson. This is a routine operation that ensures the accuracy and safety of the country’s navigation aids and instrument approach procedures. The ILS is a precision approach system that provides navigational guidance signals and information on a cockpit display to guide pilots accurately to the point of landing in periods of poor visibility.

The second semi-annual test of 2025 will take place for two nights during the week of July 21 from approx. 12:00AM to 4:00AM and will involve all runways at Toronto Pearson. It will take approximately 20 minutes per runway.

Pre-approved flights do operate in the overnight hours in accordance with the Night Flight Restriction program in effect between 12:30 am and 6:30 am. However, given that the flight checks will involve flight patterns of repeated approaches for the runways at varying combinations of height, speed, and direction, we wanted to inform you that there might be noise impacts in your riding.

We have already posted the information on our Noise Advisory Calendar, and will also be posting a message on WebTrak.

Affected residents can feel free to reach out to the Toronto Pearson Noise Management Office directly if they have any questions or wish to submit a noise complaint:

  • Online using WebTrak or the complaint form
  • By phone 416-247-7682

WATER INTERRUPTION NOTICE Watermain Replacement and Improvement 1706 and 1730 Dundas Street East Monday July 21, 2025 between 8 a.m. and 6 p.m. Project 18-1310

By Resources, Ward 1

WATER INTERRUPTION NOTICE

Watermain Replacement and Improvement 1706 and 1730 Dundas Street East Project 18-1310 C2

Peel Region regularly maintains and repairs the watermains in your area. Sometimes, we need to turn off your water supply while we do this work.

Your water will be turned off on Monday July 21, 2025 between 8 a.m. and 6 p.m. If we need to reschedule this work due to weather or other unexpected events, we’ll let you know the new date and time.

Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
•Ensure maintenance, mechanical or plumbing staff are on site during the interruption, as it may affectinternal systems that rely on water such as boilers, fire suppression, and alarms.
•Notify the fire alarm company if the interruption could affect an alarm system.
•Have a fire watch completed during the water interruption, as the building’s sprinkler protection systemwill not function when the water supply is shut off.

After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (starting in the basement/first floor and finishing on the top floor). You’ll likely need to run the water for 10 to 30 seconds. Run the water until it is clear and any vibration or noise has stopped.

Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
•905-791-7800, extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
•905-791-7800 extension 4409 (after hours or statutory holidays)

Get the latest project updates
•Sign up for e-notices by visiting peelregion.ca/construction/signup
•Project information can be found at peelregion.ca/construction/project-18-1310-c

We understand construction can be disruptive, and we appreciate your patience as we work to improve our community’s infrastructure. This work both maintains and improves Peel’s world-class water systems, allowing us to provide safe drinking water to support a thriving community for life.

If you have any questions, please contact us.
Water Linear Engineering
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

Upcoming Metrolinx Works South Service Road

By Announcement, Construction, Hurontario LRT, Ward 1

As construction continues on the Hazel McCallion Line, crews will install new hydro poles along South Service Road, east of Hurontario Street.  Work is scheduled to take place overnight on July 17, 2025, from 7 p.m. to 7 a.m. on July 18. To perform this work safely and efficiently, the southeast ramp to the QEW highway will be also temporarily closed on July 18 from 12 a.m. to 5 a.m. Works will resume during the day from 7 a.m. to 7 p.m. on July 22, 2025, to install the remaining poles.

Traffic signal timings will be adjusted to keep people moving. Only one sidewalk at the time will be maintained east of Hurontario Street at South Service Road during the day of pole installation. The pedestrian tunnel at the QEW will not be impacted by this work. Motorists can access South Service Road east of Hurontario Street, and eastbound on the QEW highway by traveling eastbound on North Service Road to Cawthra Road. Motorists traveling westbound along South Service Road will be able to access Hurontario Street by using Crestview Avenue, Radley Road, Broadmoor Avenue, and Pinewood Trail.   Access for emergency vehicles will be maintained during these works.

TEMPORARY ROAD CLOSURE

SOUTH SERVICE ROAD EAST OF HURONTARIO STREET, AND

SOUTHEAST QEW HIGHWAY ON-RAMP

FOR LRT WORK

The LRT contractor is conducting pole installation on South Service Road and on Hurontario Street which will require a temporary road closure and a ramp closure.  During the closure, motorists will not be able to travel east or west on South Service Road east of Hurontario Street and will not be able to access QEW from the southeast on-ramp.

Variable Message Signs have been installed advising motorists of the planned closure. A public notice has been delivered to the area advising of the temporary road closure (attached). 

South Service Road east of Hurontario Street

  • From Thursday July 17th at 07:00 pm through to Friday July 18th at 07:00 am, 2025

Southeast on-ramp at QEW

  • Friday July 18th starting at 12:00 am until 05:00 am

Please note that the LRT constructor has been approved to work 24 hours a day to reduce the overall duration of the closures.

NOTE:  Construction schedules are subject to change due to weather conditions and unforeseen construction conditions.  Should the schedule require changes for any reason, an updated notice will be circulated.

 

WATER INTERRUPTION NOTICE Watermain Replacement and Improvement 1672, 1684 and 1694 Dundas Street East – Tuesday July 15, 2025 between 8 a.m. and 6 p.m.

By Resources

WATER INTERRUPTION NOTICE
Watermain Replacement and Improvement
1672, 1684 and 1694 Dundas Street East
Project 18-1310 C2

Peel Region regularly maintains and repairs the watermains in your area. Sometimes, we need to turn off your water supply while we do this work.
Your water will be turned off on Tuesday July 15, 2025 between 8 a.m. and 6 p.m. If we need to reschedule this work due to weather or other unexpected events, we’ll let you know the new date and time.

Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
• Ensure maintenance, mechanical or plumbing staff are on site during the interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
• Notify the fire alarm company if the interruption could affect an alarm system.
• Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (starting in the basement/first floor and finishing on the top floor). You’ll likely need to run the water for 10 to 30 seconds. Run the water until it is clear and any vibration or noise has stopped.

Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
• 905-791-7800, extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
• 905-791-7800 extension 4409 (after hours or statutory holidays)

Get the latest project updates
• Sign up for e-notices by visiting peelregion.ca/construction/signup
• Project information can be found at peelregion.ca/construction/project-18-1310-c

We understand construction can be disruptive, and we appreciate your patience as we work to improve our community’s infrastructure. This work both maintains and improves Peel’s world-class water systems, allowing us to provide safe drinking water to support a thriving community for life.

If you have any questions, please contact us.
Water Linear Engineering
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

SCHEDULED WATER SUPPLY INTERRUPTION NOTICE – 944 Hampton Crescent, Mississauga – Tuesday July 15th, 2025, from 9:00am- 5:00pm

By Resources, Ward 1

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off Tuesday July 15th, 2025, from 9:00am- 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

INTERRUPTION DETAILS

Date and Time: Tuesday July 15th, 2025, 9:00am- 5:00pm.  

Location:  944 Hampton Crescent, Mississauga.                          

Addresses Affected:  919-952 Hampton Crescent, Mississauga.                        

Project #:  C-604148

Regional Inspector: Vijay Patel

Telephone #   437-220-6987.

Peel Region presents progress on Seniors Services in 2024

By Announcement

Strengthens commitment to person-centred, emotion-based care 

BRAMPTON, ON (July 10, 2025) – Seniors Services, comprised of the Long Term Care (LTC) and Seniors Services Development (SSD) Divisions, presented its 2024 annual performance report for Adult Day Services and Long Term Care Centres to Regional Council. 

With seniors representing the fastest-growing population in Peel – projected to make up 20% of the population by 2041 — and 65% of LTC residents already living with dementia, Peel Region continues to take bold, innovative steps to deliver person-centred, emotion-based care in line with the Seniors Services Strategic Plan. 

Key achievements in 2024 include: 
 

  • Reaching More Seniors: Services were delivered to 861 residents across Peel Region’s LTC Centres, while 405 community members were supported through in-person Adult Day Services (ADS), and another 101 participated in Virtual ADS. 
     
  • Exceeding Provincial Standards: Peel Region LTC outperformed the provincial average on all six quality indicators for LTC home performance: antipsychotic use without a psychosis diagnosis, worsened skin and wounds, use of physical restraints, falls, worsened pain, and worsened mood from symptoms of depression. 
     
  • Excellent Client and Resident Satisfaction: 100% of ADS clients reported satisfaction with overall programs and services; 98% felt services helped maintain or improve their well-being; and 93% agreed that ADS participation helped them live at home longer. 88% of people living in one of our five Peel LTC homes were satisfied with the quality of care received, and 83% would recommend their centre to others as a place to live. 
     
  • Recognition for Clinical Excellence: For the 10th consecutive year, Peel Region LTC was re-designated as a Best Practice Spotlight Organization by the Registered Nurses Association of Ontario. 

  • Expanding Emotion-Based Care: All seven LTC Butterfly home areas were re-certified by Meaningful Care Matters, with accreditation underway at two additional Butterfly home areas at the Seniors Health and Wellness Village (SHWV) at Peel Manor. Emotion-based care is also being implemented in all five ADS programs with Malton Village becoming the first Butterfly certified ADS program in Peel Region and in Canada. 
     
  • Innovation at the Seniors Health and Wellness Village at Peel Manor: The SHWV at Peel Manor continues to serve as a leading model of care, offering support and services through an integrated care centre, an eight-bed overnight respite care unit, expanded ADS capacity, and the Thrive program for seniors and their informal caregivers. 
     
  • Behavioral Supports: In its first year, the Transitional Behavioural Support Unit admitted 36 individuals with advanced dementia-related symptoms. As the Lead Agency for Behavioural Supports Ontario, Peel Region is expanding mobile behavioural support teams across Central West to assist residents with dementia, support transitions, stabilize new admissions, and address resource challenges in collaboration with 23 LTC homes and partners. 
     
  • Reducing Hospitalizations: LTC Nurse practitioners are leveraging point-of-care testing and advanced clinical skills to reduce unnecessary hospital transfers through early intervention and on-site treatment within their long-term care home. 
     
  • Improving End-of-Life Care in LTC: Palliative care tools piloted at Vera M. Davis Centre in Caledon with provincial funding are enhancing comfort and family-led approaches at end-of-life, reducing unnecessary hospital transfers and supporting culturally sensitive care, with plans to roll out across Peel Region LTC. 
     
  • Investing in Staff Well-being: The Culture and Wellness program supports staffs’ resilience with mental health resources, Health specific leadership development, and burnout prevention experienced in the health sector, helping to address sector-wide staffing challenges. 

Peel Region Releases Annual Accessibility Status Report

By Announcement

BRAMPTON, ON (July 10, 2025) – Peel Region has released its Annual Accessibility Status Report, outlining Peel’s 2024 accomplishments and initiatives to eliminate barriers and ensure residents of all abilities can access services fully and independently.

The report highlights initiatives that meet and exceed the requirements of the Accessibility for Ontarians with Disabilities Act, 2005 (AODA) and outlines Peel’s ongoing work to implement its 2018–2025 Multi-Year Accessibility Plan. Peel remains committed to delivering inclusive and accessible programs for all members of the community.

Highlights from 2024 include:

  • The opening of the award-winning Seniors Health and Wellness Village at Peel Manor, integrating accessible technologies and care services.
  • Ongoing improvements to ensure Peel’s website is accessible and user-friendly, with continued progress toward full AODA compliance.
  • An accessibility lens applied to the design and retrofitting of Peel’s EV charging stations.
  • Accessibility enhancements across community health clinics.
  • Accessible housing and social supports to meet community needs.
  • Walking audits to assess the accessibility, ease, and safety of neighbourhoods across Peel.

Peel’s Accessibility Advisory Committee (AAC) plays a vital role in shaping accessible services offering valuable insights and advice on the accessibility of Peel’s programs, services, and facilities.

Advancing diversity, equity, inclusion, and accessibility for both the workforce and community is a top priority for Peel Region. The 2024 Annual Accessibility Status Report demonstrates the collective work of Peel’s staff, community partners, the Office of Culture and Inclusion, and AAC members in building a region where all residents can fully participate in community life.

Residents are encouraged to read the full report and share feedback. Alternate formats are available upon request.

WATER INTERRUPTION NOTICE Watermain Replacement and Improvement -1655 and 1672 Dundas Street East – Monday July 14, 2025 between 8 a.m. and 4:30 p.m.

By Resources, Ward 1

July 10, 2025
WATER INTERRUPTION NOTICE
Watermain Replacement and Improvement

1655 and 1672 Dundas Street East
Project 18-1310 C2
Peel Region regularly maintains and repairs the watermains in your area. Sometimes, we need to turn off your water supply while we do this work.
Your water will be turned off on Monday July 14, 2025 between 8 a.m. and 4:30 p.m. If we need to reschedule this work due to weather or other unexpected events, we’ll let you know the new date and time.

Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
• Ensure maintenance, mechanical or plumbing staff are on site during the interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
• Notify the fire alarm company if the interruption could affect an alarm system.
• Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (starting in the basement/first floor and finishing on the top floor). You’ll likely need to run the water for 10 to 30 seconds. Run the water until it is clear and any vibration or noise has stopped.

Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
• 905-791-7800, extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
• 905-791-7800 extension 4409 (after hours or statutory holidays)

Get the latest project updates
• Sign up for e-notices by scanning the QR code or visiting peelregion.ca/construction/signup
• Project information can be found at peelregion.ca/construction/project-18-1310-c

We understand construction can be disruptive, and we appreciate your patience as we work to improve our community’s infrastructure. This work both maintains and improves Peel’s world-class water systems, allowing us to provide safe drinking water to support a thriving community for life.

If you have any questions, please contact us.
Water Linear Engineering
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca

Public Meeting – Planning and Development Committee – 42-46 Park Street East and 23 Elizabeth Street North

By Planning & Development, Ward 1

Please be informed of a proposed development in your neighbourhood

42-46 Park Street East and 23 Elizabeth Street North
West of Hurontario Street, north of Park Street East
Applicant’s Proposal: To change the use of these lands to permit a 30 storey apartment
building containing 378 dwelling units
Application submitted by: Edenshaw Elizabeth Developments Limited
File: OZ/OPA 25-10 W1

In Person and Virtual Public Meeting
Meeting Date and Time: Monday, October 27, 2025 at 1:30 p.m.
Meeting Place: Mississauga Civic Centre, Council Chamber, 300 City Centre Drive

The applicant is proposing to change the official plan and zoning to permit a 30 storey apartment building, containing 378 dwelling units, including 123 underground parking spaces

The remediation of potential on-site contamination will be evaluated through the review of these applications and addressed in the Corporate Report.

Meeting Details:
This meeting will be held in person and online. Advance registration is required to make a verbal submission at the meeting either virtually or in person Friday at 12:00 p.m. prior to the meeting
date. The proceedings will be streamed live online for the public to view at the following link: http://www.mississauga.ca/portal/cityhall/council-and-committee-videos. If you wish to phone in to listen to the meeting only, please call 905-615-3200, ext. 7504 for instructions.

Options for participating in the meeting are outlined below.

Purpose of Meeting:
 For people to ask questions and share their views about the proposal
 For Planning and Development Committee to receive a report that provides information on the project, addresses issues and provides a recommendation on the proposal
 For Planning and Development Committee to make a decision about this project

The report will be available on-line one week prior to the meeting at: http://www.mississauga.ca/portal/cityhall/planninganddevelopment

For detailed information contact:
City Planner Lucas Petricca at 905-615-3200 ext. 5733 or lucas.petricca@mississauga.ca
If you would like to share your views and/or be added to the official record, please contact the Planning and Building Department by Friday at 12:00 p.m. prior to the meeting date:
 by mail to 300 City Centre Drive, Development and Design Division, Mississauga ON L5B 3C1
 by email to application.info@mississauga.ca
 by visiting the following link: https://www.mississauga.ca/services-and-programs/planningand- development/development-applications/active-developmentapplications/ development-application-oz-opa-25-10-w1/

Please include your name, your address, and application number or address of the property you are providing comments on.

Written Comments:
In order to be received by Committee at the public meeting, written comments must be received no later than Friday at 12:00 p.m. prior to the meeting date. Submissions are accepted by email at deputations.presentations@mississauga.ca or by mailing the Planning and Development Committee, City Clerks Office, 300 City Centre Drive, Mississauga, ON L5B 3C1. Please include your name, your address, and application number or address of the property you are providing comments on. Written comments received before, during or after a public meeting but before a by-law is passed receive the same consideration as verbal comments made during a public meeting.

If you wish to be notified of the decision on the proposed zoning by-law amendment and/or proposed official plan amendment, you must make a written request.

How to participate in a public meeting if you wish to make verbal submissions:

Participate Virtually
Advance registration is required to participate and/or make comment virtually at the public meeting. Please email deputations.presentations@mississauga.ca no later than Friday at
12:00 p.m. prior to the meeting date. Any materials you wish to show the Committee during your presentation must be provided as an attachment to the email. Links to cloud services will not be accepted. You will be provided with directions on how to participate from Clerks’ staff.

Residents without access to the internet can participate and/or make comment in the meeting via telephone. To register, please call Heleana Tsabros at 905-615-3200 ext. 7504 no later than Friday at 12:00 p.m. prior to the meeting date. You must provide your name, address, phone number, and application number if you wish to speak to the Committee. You will be provided with directions on how to participate from Clerks’ staff.

Participate In Person
To make a verbal submission in person, advance registration is preferred. Please email deputations.presentations@mississauga.ca no later than Friday at 12:00 p.m. prior to the meeting
date.

If you are a landlord, please post a copy of this notice where your tenants can see it.
We want to make sure they have a chance to take part.

Background Studies:
Planning documents and background material submitted in support of these applications are available for review at: https://www.mississauga.ca/services-and-programs/planning anddevelopment/development-applications/active-development-applications/development-applicationoz-opa-25-10-w1/
Contact the city planner noted above for more information.

Planning Act Requirements:
The City will be processing the applications in accordance with the Provincial Planning Act which requires that all complete applications be processed.

The applications are now being circulated to City Departments and Agencies for technical review.

A report summarizing the development and the comments received will be prepared by Planning staff and presented at the Public Meeting listed in this Notice.

Personal Information:
Individuals should be aware that any personal information in their verbal or written communication will become part of the public record, unless the individual expressly requests the City to remove the personal information. Questions about the collection of this information may be directed to application.info@mississauga.ca or in writing to the Planning and Building Department at 300 City Centre Drive, Mississauga ON L5B 3C1.

Information about Appeals:
Application decisions can be appealed through the Ontario Land Tribunal. The applicant, a specified person, a public body, or the Minister, or those who own land subject to the application
can appeal. A person who otherwise would have an ability to appeal but the person or public body does not make oral submissions at a public meeting or make written submissions to the City of Mississauga before the proposed zoning by-law is passed and the proposed official plan amendment is adopted is not entitled to appeal the decision and may not be added as a party to the hearing of an appeal before the Ontario Land Tribunal.

General Information:
Visit Mississauga’s online Guide to City Planning and Development to learn more. It’s organized around topics we get asked most – such as What is City Planning, How Land Gets Developed and Ways to Get Involved. Visit www.mississauga.ca/city-planning-guide.

Date of Notice: July 3, 2025

Celebrate Historic Places Days at Mississauga Museums from July 11 to 20

By Announcement, Events

A week of discovery, creativity and culture at the Bradley Museum and Benares Historic House.

July 10, 2025

School’s out and a perfect summer adventure is just around the corner! Come take a step back in time and discover Mississauga’s fascinating past during Historic Places Days at the museum.

From July 11 to 20, uncover how local makers, artisans and storytellers have shaped Mississauga’s past while discovering how these traditions continue to inspire the city’s future.

Daily from 12 to 4 p.m., enjoy guided tours and immersive experiences at Bradley Museum and Benares Historic House that include:

Whether you’re a history buff, curious explorer or looking for some summer fun, Historic Places Days offers a fun way to connect with Mississauga’s heritage.

For those 18 years and older, join us on Saturday, July 26 at 7 p.m. for an enchanting summer evening of live music at the historic Bradley Museum barn, featuring the captivating sounds of River North. Be sure to get your tickets early for this summer serenade.

What

Historic Places Days

Where

Bradley Museum
1620 Orr Road, Mississauga

Benares Historic House
1507 Clarkson Road N, Mississauga

When

July 11 to 20, 2025

To learn more, visit the webpage.

Temporary Road Closure – Sanitary Sewer Replacement Haig and Lakeshore July 21- August 1

By Construction, Resources, Ward 1

TEMPORARY ROAD CLOSURE
Sanitary Sewer Rehabilitation
Haig Boulevard at Lakeshore Road East
Project 24-2458

The schedule, as summarized from the notice below, is as follows:

July 21, 2025: Eastbound traffic on Lakeshore Rd. E. will be reduced to a single lane from Hydro Road to Orchard Rd. The bicycle pathway parallel to Lakeshore Rd. will be diverted onto the roadway, isolated from motorists.

July 26, 2025: Westbound traffic on Lakeshore Rd. E. will be reduced from a single lane from Hydro Rd to Orchard Rd. No traffic (with exception of emergency vehicles) will be able to access Lakeshore Rd. E. from Haig Blvd. A detour will be set-up to advise motorists where to travel.

July 27, 2025: Westbound traffic to be reinstated

August 1, 2025: Eastbound traffic, including bicycle pathway, to be reinstated