As work progresses on the Hazel McCallion LRT project, crews will be doing road widening works between Inglewood Drive and Pinetree Way along the west side of Hurontario Street. These works are scheduled to take place from March 11 to May 6, 2024.
To safely accommodate these works, driveways for properties within this stretch will be intermittently and partially impacted between 7 a.m. and 5 p.m., Monday through Friday for less than four hours. To accommodate motorists needing to enter and exit driveways impacted during working hours, a flag person will be present to help as needed. During this time, asphalt and concrete curbs will be removed, followed by excavation, curb preparation, concrete pour, and paving. Once the roadway has been widened, guideway construction in the area can begin later this year.
The attached notice was distributed to within a 500 meter radius of the working area. Immediately impacted property owners have been informed.
Contact:
Call us: 416-202-7500
Write to us at: peel@metrolinx.com
Find us on Twitter @HMcCallionLine
Visit the website and sign up for our newsletter: www.metrolinx.com/hazelmccallionline
An update received from GHD, Project Managers for the Ministry of Transportation project at the QEW and Dixie:
An update for the current and upcoming closure at NSR.
- Insley Rd. Closure at NSR – The work has been completed and the Insley closed section will be opened before the end of today.
- NSR Closure from Westfield Rd. to Insley Rd. – Starting on Wednesday, Mar. 13th for approx. 2 weeks (weather permitting).
We will keep you updated.
Please contact us, should you have any questions regarding the closure of North Service Road at 905-247-8730, by e-mail at qewdixie@ghd.com, or by visiting the website at https://www.qewdixie.com
Please be advised of the following stop impacts. See the related details below:
Stop(s) Impacted: No. 0305: SB Hurontario St south of Indian Valley Trail
Temporary Stop Location: Temporary wooden platform relocated 85m south
Routes Impacted: 2 South
Date and Time: Effective Immediately
Estimated Duration: Until Further Notice
Event Type: HuLRT
Agency: Mobilinx
Notes:
– Stops will remain accessible;
– No detours required.
INTERRUPTION DETAILS
Date and Time: Wednesday, March 13th from 8:30 am to 5:00 pm
Location: 28 Ann St
Addresses Affected: 17, 19 Ann St; 84 High St E
Project #: C-601313
Regional Inspector: Walid Bhunnoo
Telephone # 289-541-6186
905-791-7800 ext. 3246/3247
The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.
Your water will be turned off on Wednesday, March 13th, from approximately 8:30 am to 5:00 pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them. During the time that the water supply is interrupted, the building’s sprinkler protection system will not function. A fire watch should be performed as necessary during time period.
After the water interruption:
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note: After the water is turned back on, we recommend checking your water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)
NOTICE OF DETAILED DESIGN AND PUBLIC INFORMATION CENTRE 3
Front Street Wastewater Pumping Station and Wastewater Diversion
The Region of Peel has retained Stantec Consulting Ltd. (Stantec) to undertake the Detailed Design for the extension of the Lakeshore Road sanitary trunk sewer and Zone 1 watermain from Jack Darling Memorial Park to Elmwood Avenue (see map).
A key component of the Detailed Design is consultation with interested stakeholders through a Public Information Centre (PIC). The PIC will present the design of the project, construction timeline, construction staging and detours, potential impacts, and potential mitigation measures. You are invited to an in-person PIC to learn more about the project.
Thursday, March 21, 2024 from 6:30 – 8:00 p.m.
Clarke Memorial Hall – Main Hall
161 Lakeshore Rd. W., Mississauga, ON, L5H 1G3
All presentation materials will be posted on the Region of Peel’s website.
Projects – construction – Region of Peel (peelregion.ca)
If you have any questions or would like to be added to the project mailing list, please contact the Region of Peel:
Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
905-791-7800, ext. 4409
The Region of Peel is committed to ensure that all Regional services, programs, and facilities are inclusive and accessible for persons with disabilities. Please contact a Project Manager if you need any disability accommodations to provide comments or feedback for this study.
This notice was first issued on March 6, 2024.
Come visit one of the favorite Farmer’s Markets in Mississauga! Our market features local, sustainable produce, unique artisan products and some treats for the entire family…including the pups!
Enjoy a great selection of fresh produce, cheese, eggs, baked goods, food and beverages, artisanal fare, and live music.
Farmer’s Markets provide an essential source of income for local farmers, growers, producers, and artisans.
Supporting local Farmer’s Markets builds better communities, helps with local sustainability efforts, and offers the opportunity to bring farm-fresh, healthy food alternatives to your table.
Come down to Port Credit to connect with our community in the Village, take a stroll along the lakeshore, and buy locally grown . . . right from the Farmer!
We would like to provide links to key information discussed at the meeting:
- Crime Statistics & Crime Occurrence Mapping Portal
https://www.peelpolice.ca/en/in-the-community/crime-statistics-and-maps.aspx - Crime Prevention Tips
https://www.peelpolice.ca/en/safety-tips/protecting-yourself-and-your-property.aspx - Safe City Mississauga/Neighbourhood Watch
https://safecitymississauga.on.ca/programs/neighbourhood-watch/#1565266093600-88da369b-72f1 - Contact Information for 11 & 12 Division Community Liaison Officers
- 11 Division (West of Mavis Rd. and the Credit River south of the QEW)
- Constable Rowena Pryce – (905) 453-2121 ext. 1160
- 12 Division (East of Mavis Rd. and the Credit River south of the QEW)
- Constable Wendy Amantea – (905) 453-2121 ext. 1260
- 11 Division (West of Mavis Rd. and the Credit River south of the QEW)
Subscribe to PRP’s newsroom to keep up-to-date with what we’re doing by receiving real-time information sent directly to your inbox: https://subscribe.peelpolice.ca/Subscribe
Increased capacity will accommodate more housing in support of Bill 23
Peel Region council approved an additional investment of $130 million to increase wastewater capacity by 40 million litres per day (MLD), at the G.E. Booth Water Resource Recovery Facility, (WWRF). An additional 40 MLD of flow capacity can support additional housing units of between 28,000 and 47,000, depending on the type of development.
Peel Region staff and their consultant have identified opportunities to make increased capacity available sooner by advancing construction through their current capital contractors, ROMAG Contracting Ltd. and CIMA Canada Inc. This will result in additional capacity being available by 2028 instead of 2039, provide better value for tax dollars and support project growth targets from Bill 23.
Peel staff are working on the new capital works master plan, scheduled for completion in 2025, which includes an assessment of the infrastructure required to meet Bill 23 growth projections. As part of this planning work staff are identifying projects that can be advanced earlier. The investment to increase capacity at G.E. Booth is one such project.
The G.E. Booth (Lakeview) Water Resource Recovery Facility (WRRF) is the Region of Peel’s largest wastewater treatment plant. The facility originally went into service in 1955 and has undergone multiple expansions and currently has a capacity of 518 MLD. The plant serves the eastern portion of the Region of Peel and part of York Region. The plant is designed to treat municipal wastewater from residential, commercial, and industrial customers.
Yard waste collection begins the week of March 4 in Peel, with the cities of Brampton and Mississauga receiving weekly yard waste collection and urban areas in the Town of Caledon receiving bi-weekly yard waste collection. Rural areas of Caledon will have yard waste picked up on designated Fridays.
Residents can check their collection calendar to find their pickup day or sign up to receive free weekly waste collection reminders at peelregion.ca/waste/reminders.
Reminders:
- Yard waste must be at the curb by 7 a.m. on your collection day.
- Put yard waste at the curb in kraft yard waste bags (plastic bags not accepted), or containers that are clearly labelled “yard waste” by marker or sticker.
Peel Region no longer accepts grass clippings at the curb or at Community Recycling Centres.