This is to notify you of upcoming herbicide application to control Wild Parsnip beginning June 24th, 2025.
Contractors working on behalf of the City, Brinkman & Associates Reforestation Ltd., will apply VisionMax (Glyphosate) directly to the plants using a handheld/backpack sprayer to minimize impacts to plants in the surrounding area. Notification signs will be posted at all access points to the spray area at least 24 hours prior to treatment and will be removed no less than 48 hours after treatment. Treatment should be completed within 2 weeks, but the timelines may be extended as needed depending on weather conditions.
The site list is as follows:
- Helen Molasy Memorial Park
- J.C Saddington Park
- Orchard Heights Park
This work supports the City’s Invasive Species Management Program and improves the health of natural areas across the City.
The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we work on the system or conduct tests.
On Thursday, June 19th, 2025. From 9:00am to 11:00am. Please expect a brief water outage and loss of water pressure while we work in your area. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
- Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
- Notify the fire alarm company if the interruption could affect an alarm system.
- Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.
After the test shutdown
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- 905-791-7800, extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- 905-791-7800 extension 4409 (after hours or statutory holidays)
If you have any questions, please contact us.
Construction Inspections
Engineering Technical Services Division
Operations Support, Public Works
Email: zzgetsdevadmin@peelregion.ca
Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)
Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)
INTERRUPTION DETAILS
Date and Time: Thursday, June 19th, 2025. From 9:00am to 11:00am
Location: 246 Eaglewood Blvd, Mississauga.
Affected Addresses: 193-262 Eaglewood Blvd.
Project #: C-604549
Regional Inspector: Vijay Patel
Telephone # 437-220-6987
The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.
Your water will be turned off on Tuesday, June 17th, 2025. From 9:00 AM to 5:00 PM. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
- Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
- Notify the fire alarm company if the interruption could affect an alarm system.
- Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.
After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped
Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- 905-791-7800 extension 4409 (after hours or statutory holidays)
If you have any questions, please contact us.
Construction Inspections
Engineering Technical Services Division
Operations Support, Public Works
Email: zzgetsdevadmin@peelregion.ca
Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)
Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)
INTERRUPTION DETAILS
Date and Time: Tuesday, June 17th, 2025. From 9:00am to 5:00pm.
Location: 30/32 Oakwood Ave N.
Addresses Affected: 30-55 Oakwood Ave N.
Project #: C-603012
Regional Inspector: Vijay Patel
Telephone # 437-220-6987.
Celebration includes a ceremony, tours of the facility, entertainment and free activities throughout the day.
June 10, 2025
The redeveloped facility features a new fitness and aquatics centre, 25-metre six-lane pool, warm water therapy pool, climate controlled indoor walking track, two indoor ice surfaces, an active living studio and various improved exterior connections to the woodlot and Mississauga Seniors’ Centre.
What
Opening of Carmen Corbasson Community Centre
When
Saturday, June 14, 2025
11 a.m. Ceremony with Mayor Parrish, Ward 1 Councillor Stephen Dasko, Members of Council, dignitaries and special guests
11:30 a.m. Free programming, entertainment and activities continue
4 p.m. Event concludes
Where
Carmen Corbasson Community Centre
1399 Cawthra Rd, Mississauga
Cost
Free
More information about the upcoming event can be found on the event calendar listing.
A list of the free activities and drop-in programs can be found on Active Mississauga.
As apart of the Lakeview Village Project the closure of Lakefront Promenade at Lakeshore Road E is required to accommodate for service connections.
When: June 11th, 2025 and June 12th, 2025
Where: Lakefront Promenade at Lakeshore Road E
Emergency services are not permitted. Detour route will be in place during the duration of the works.
Upcoming herbicide application to control Dog-strangling vine, Japanese knotweed, Burdock, Lily-of-the-valley, and Yellow archangel in natural areas during June 16th – June 27th. If any touch ups are needed the contractors will be returning between July 14th – July 18th.
The parks being treated are:
- Adamson Estate,
- Cawthra
- P-510 (Between Indian Valley Trail and Kenollie Ave, East of Stavebank Rd)
Phragmites (Common Reed), will be treated at various dates between the end of July and mid September at the following location:
- Adamson Estate,
- P-510 (Between Indian Valley Trail and Kenollie Ave, East of Stavebank Rd)
Contractors working on behalf of the City, Invasive Phragmites Control Centre, will be applying RoundUp WeatherPRO (Glyphosate) or Habitat Aqua (Imazapyr) directly to the plants using a handheld/backpack sprayer to minimize impacts to plants in the surrounding area. Habitat Aqua will only be used in wet areas and the City has obtained the proper permits to apply this herbicide.
Notification signs will be posted at all access points to the spray area at least 24 hours prior to treatment and will be removed no less than 48 hours after treatment. Timelines may be extended as needed depending on weather conditions.
This work supports the City’s Invasive Species Management Program and improves the health of natural areas across the City.
The Park Supervisor and 311 have been notified of these operations.
The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.
Your water will be turned off on Wednesday, June 11th, 2025. From 10:00 AM to 5:00 PM. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
Property owner/manager responsibilities during a water interruption
As a property owner/manager, it is your responsibility to:
- Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
- Notify the fire alarm company if the interruption could affect an alarm system.
- Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.
After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- 905-791-7800 extension 4409 (after hours or statutory holidays)
If you have any questions, please contact us.
Construction Inspections
Engineering Technical Services Division
Operations Support, Public Works
Email: zzgetsdevadmin@peelregion.ca
Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)
Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)
INTERRUPTION DETAILS
Date and Time: Wednesday, June 11th, 2025. From 10:00am to 5:00pm.
Location: 1205 & 1209 Canterbury Rd, Mississauga.
Addresses Affected: 429 Niar Ave, 1188-1209 Canterbury Rd.
Project #: C-604347
Regional Inspector: Vijay Patel
Telephone # 437-220-6987

































