2024 Intersection Improvement Project Cawthra Road and Arbor Road as part of the Carmen Corbasson Community Centre Project

By Planning & Development, Transit, Ward 1

Construction scheduled to commence: on or after November 4, 2024
Construction scheduled to be completed: by end of December, 2024

Scope of Work:
The work will include but not limited to; installation of concrete bus bays, concrete truck aprons, installation and removals of concrete bus pads, new sidewalks and curbs (barrier and mountable), catch basin/maintenance adjustment and/or repair, subdrain installation, driveway boulevard repair, sod replacement, installation and modification of traffic control signals and streetlights. Map of work area on reverse.

What to Expect During Construction

Impact/Safety
Dust, noise and other inconveniences may be experienced. The City will make every effort to reduce
these impacts. Avoid contact with hot asphalt or any construction material at all times.

Work Hours
Work will occur between 7am- 7pm Monday to Friday.

Traffic and Pedestrians
Sidewalk Impacts

Pedestrians are encouraged to use the sidewalks on west side of Cawthra Road.
There will be sidewalk closures at times. Please follow posted signage.

Road Impacts

There will be single lane closures between 9am and 3:30pm on certain days. Please
follow posted signage.

Utility Disruptions
Temporary disruptions to utilities, i.e. gas, hydro, water, cable, telecommunications may be experienced.
Every effort will be made to promptly restore services.

Restoration Works
The construction site will be restored after construction has been completed.

MiWay Impacts
Stop #0493 will be closed through out the duration of project. Riders are encouraged to use Stop #0416

Please do not hesitate to contact us if you have any questions and/or concerns

Project Information:
Capital Works Field Ambassador
Marcela Colangelo
905-330-2913
capital.fieldambassador@mississauga.ca

Construction Information:
Site Inspector
Manny De Sousa
manny.desousa@mississauga.ca
905-615-3200 x3963

General Inquiries:
3-1-1
public.info@mississauga.ca
TTY Hearing Impaired Service:
905-615-3411

Thank you for your patience and cooperation:
Visit: mississauga.ca/construction

Metrolinx is making it easier for fans to get to the Taylor Swift concert!

By Announcement, Events, Transit

There will be special event service November 14-16 and 21-23 on the Lakeshore West and Lakeshore East lines to help get fans to and from the Taylor Swift concert safely.

Lakeshore West

Going to the concert:

  • On November 14, 15, 21, 22, extra trips will depart Oakville GO at 5:05 p.m., 5:35 p.m., and 6:05 p.m., making stops at Clarkson and Port Credit, then running express to Union Station.

Coming home safely:

  • On November 14, 15, 21, 22, an extra weekday trip will depart Union Station at 12:02 a.m., making all stops to Burlington GO.
  • On November 16 and 23, an extra weekend trip will depart Union Station at 11:59 p.m.., making all stops to Burlington GO.

We expect our trains and platforms to be busier than usual. During this busy time, all trains approaching each station will sound their bells and whistles to ensure customer safety. Please keep alert in crowded areas and stay well back from the yellow line on train platforms. Crossing train tracks is dangerous and illegal; only use the stairs or elevators to get to another platform.

Bus Stop Impacts – Dundas Street East (Stop #3536)

By Announcement, Transit

Please be advised that stop #3536 on WB Dundas Street west of Wharton Way, will be out of service effective 9:00am Wednesday November 13 until end of day Monday November 18 for construction works.

Patrons will be directed to the next stop #0876 at Treadwells Drive which is approximately 125 metres west.

Stop #3536 is serviced by Route 1/1C West with continued accessible bus service at Stop #0876.